Daikin RDT-135c Installation And Maintenance Manual page 128

Roofpak series singlezone roof mounted heating and cooling units
Table of Contents

Advertisement

Rooftop Equipment Warranty Registration Form
Warranty Registration Form (continued)
E. Ambient temperature ______________________ °F
F. Oil safety control time delay (sizes 115 to 135C only):
G. Compressor lockout timers function? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
H. FanTrol functions:
I. Part winding start time functions (sizes 115 to 135C option only):
Compressor:
Supply fan:
Return fan:
J. Does unit start up and perform per sequence of operation?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
IV. PERFORMANCE DATA
A. Compressor voltage across each phase:
B. Compressor amperage of fully loaded compressor:
Compressor #1
Compressor #2
Compressor #3
Compressor #4
Compressor #5
Compressor #6
C. Low pressure cut-out:
Low pressure cut-in:
D. High pressure cut-out:
E. Discharge pressure, one compressor:
Discharge pressure, fully loaded, 2–3 compressors:
F. Suction pressure, one compressor:
Suction pressure, fully loaded, 2–3 compressors:
Liquid press, fully loaded, 2–3 compressors
(at liquid line shutoff valve):
Liquid temperature, fully loaded, 2–3 compressors:
G. System oil pressure (oil pressure-suction-net oil pressure):
(on four-compressor units, indicate for each compressor)
H. Suction line temperature:
I.
Superheat:
J. Is the liquid in the line sightglass clear and dry?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
K. Does the hot gas bypass valve function properly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
L. At what suction pressure does the hot gas bypass valve open?
M. Record discharge air temperature at discharge of unit:
N. Are all control lines secure to prevent excessive vibration and wear? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
O. Are all gauges shut off and valve caps and packings tight after start-up? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
V. ELECTRIC HEAT CHECK, TEST & START
A. Electrical heat service corresponds to unit nameplate? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
Volts
B. Are there any signs of physical damage to the electric heat coils? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
C. Have all electrical terminals been tightened? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
D. Does sequence controller stage contactors properly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
E. Electric heater voltage across each phase:
F. Amp draw across each phase at each heating stage:
Stage 1
Phase L1:
___________
Phase L2:
___________
Phase L3
___________
G. FLA:
L1 ___________
H. Operate electric heat with fans off. Electric heat must cycle on high limit control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
126
TC13 ________
TC14 ________
TD1 __________
TD2 __________
TD9 __________
TD19 _________
1–2 _________ V
Phase 1 ________
Phase 2 ________ Phase 3 _______
Phase 1 ________
Phase 2 ________ Phase 3 _______
Phase 1 ________
Phase 2 ________ Phase 3 _______
Phase 1 ________
Phase 2 ________ Phase 3 _______
Phase 1 ________
Phase 2 ________ Phase 3 _______
Phase 1 ________
Phase 2 ________ Phase 3 _______
Circuit 1 ___________ psig
Circuit 1 ___________ psig
Circuit 1 ___________ psig
Circuit 1 __________ psig
Circuit 1 __________ psig
Circuit 1 __________ psig
Circuit 1 __________ psig
Circuit 1 __________ psig
Circuit 1 __________ psig
Circuit 1 ___________ psig
____________ °F
____________°F
____________ °F
____________°F
Hertz
Phase
___________ L1
Stage 2
Stage 3
____________
____________
____________
____________
____________
____________
L2____________
L3 ___________
Compressor #1 ________sec.
Compressor #2sec.
TD3 __________
2–3 _________ V
Circuit 2 ___________psig
Circuit 2 ___________psig
Circuit 2 ___________psig
__________ psig
___________ °F
___________ L2
Stage 4
___________
___________
___________
Compressor #3________ sec.
Compressor #4_________sec.
No
TD4 __________
No
1–3 ________ V
Circuit 2 __________ psig
Circuit 2 __________ psig
Circuit 2 __________ psig
Circuit 2 __________ psig
Circuit 2 __________ psig
Circuit 2 __________ psig
Circuit 2 __________ psig
No
No
__________ psig
_________ psig
No
No
No
No
No
No
___________ L3
Stage 5
Stage 6
___________
____________
___________
____________
___________
____________
No
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
IM 738-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents