Commissioning

4.3.7.12 Grid code confirm

User can confirm grid code parameters as following, such as voltage and frequency
protection parameters.
More detail of F/VRT will be show in appendix.(For HECO and Rule 21).
Meter
Energy Log
Event Log
Inverter Info.
EXIT
S/N: RN11179CB0
Install: 01/01/2016
INV ID:
1
FW Version
DSP:
1.30
COM:
91.05
SCM:
1.35
ENT
RED:
61.06
ARC:
1.05
Figure 4-20: Grid Code Confirm screens
Country:
Insulation:
Baud Rate:
AC connection:
Max. Power:
Dry Cont A:
Dry Cont B:
EPO
Grid Settings
Active Pwr Settings
React Pwr Settings
64
HECO A
100k
19200bps
3P3W
46000W
Disable
Disable
Normal Open