Conversion To Other Gas Types (If Required) - Wolf CGB-75 Installation And Operating Instructions Manual

Wall mounted gas condensing boiler
Table of Contents

Advertisement

Note:
During the conversion from natural gas to LPG, a flue gas orifice plate must also be installed in the condensate pan as
follows. During conversion from LPG to natural gas, the flue gas orifice plate must be removed.
This installation step is carried out prior to the installation of the mixing chamber and full assembly.
8)
After removing the upper casing cover, undo the self-tap-
ping screw at the balanced flue locking mechanism.
9)
Slide the balanced flue locking mechanism in the direction
of the arrow. Pull the flue pipe up out of the condensate pan.
Conversion sets for CGB-75/100 for conversion to other gas types: (Please state the corresponding part number when ordering)
Conversion to natural gas E/H (G20)
Conversion to natural gas LL** (G25)
Conversion to LPG P*** (G31)
Conversion from LPG P (G31) to natural gas E/H (G20)
Conversion from LPG P (G31) to natural gas LL** (G25)
* ID imprinted on gas restrictor
** Natural gas LL and E are not applicable for Austria / Switzerland
*** LPG not applicable for Switzerland
3062555_201804
16. Conversion to other gas types (if required)
Conversion type plate
10)
Flue gas orifice plate
Place the flue gas orifice plate Ø 53 mm into the condensate
pan and insert the flue pipe again.
Note:
During conversion from LPG to natural gas, the
flue gas orifice plate must be removed. Fit the
mixing chamber as described under point 6).
Re-assemble in reverse order.
11)
Updating the type plate
Cut out the relevant lines from the type plate supplied
and affix them over the relevant lines on the appliance
type plate.
Fig.: Updating the type plate
ID 1000*
ID 1260*
ID 6.7*
ID 1000*
ID 1260*
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents