Delivered Condition / Standard Delivery - Wolf CGB-75 Installation And Operating Instructions Manual

Wall mounted gas condensing boiler
Table of Contents

Advertisement

Delivered condition
Gas condensing boiler
The standard delivery includes:
1 Gas condensing boiler ready to connect with the casing fitted
1 Mounting bracket for mounting on the wall, with installation
accessories
1 Installation instructions
1 Operating instructions
1 Maintenance instructions
1 Trap with hose
1 Maintenance tools
Boiler connections
Fig.: Connections with heating circuit connection set (accessory)
Heating circuit pump assembly (accessory)
Modulating
pump
Safety valve
Pressure gauge
Drain & fill valve
Fig.: Pump assembly (accessory)
12
5. Delivered condition /
standard delivery
Heating flow
Heating return
G 1½"
Heating flow
Heating return
G 2"
Accessories
The following accessories are required for installation of the
gas condensing centre:
- Balanced flue accessories (see technical information)
- Room temperature-dependent or weather-compensated
control
- Condensate drain outlet with hose retainer
- Gas ball valve with fire protection
- Fitting assembly for heating flow, heating return and integral
safety assembly
- Pump assembly with variable speed pump and integral safety
assembly
- Low loss header set for one or two appliances in a cascade
- Dirt filter in the heating return
Condensate
G 1½"
drain
G 2"
Expansion vessel 1"
Gas connection
R ¾"
Gas tap
Trap
Drain & fill valve
Connection
3062555_201804

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents