Installation Of The Air/Flue Gas Routing - Wolf CGB-75 Installation And Operating Instructions Manual

Wall mounted gas condensing boiler
Table of Contents

Advertisement

For concentric air/flues (balanced flue systems),
Note
use only original Wolf components.
Observe the technical information regarding
ventilation air supply / flue systems prior to
installing the flue or making the balanced flue
connection.
As regulations in the individual German Federal
States differ, we recommend consulting the rele-
vant authorities and local flue gas inspector prior
to installation.
The flue gas test ports must remain accessible
Note
for the local flue gas inspector, even after fitting
the ceiling bezels.
At low outside temperatures, the water vapour
contained in the flue gas may condense and
freeze on the air/flue gas routing system. Pre-
vent falling ice through on-site measures, e.g.
the installation of a suitable snow guard.
3062555_201804
11. Installation of the air/flue gas routing
Fig.: Example: balanced flue
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents