Balanced flue route, vertical and concentric (examples)
1
Gas condensing boiler
2
Gas condensing boiler
connections DN110/160
3
Inspection piece
3a
Inspection piece, 87° tee
4
Pipe clip DN 160
5
Balanced flue DN 110/160
500 mm
1000 mm
2000 mm
6
Mounting bracket DN 160
for roof outlet
7
Universal tile for
pitched roof 25-45°
7a "Klöber" adapter 20-50°
8
Flat roof collar
9
Balanced flue routing vertical
(roof outlet)
for flat or pitched roof
L=2000 mm
10
Bend 45° DN 110/160
11
Bend 87° DN 110/160
12 87° bend for duct installation
DN 110/160
13 External wall support bend F87°
with smooth ends on both side of
the air pipe DN 110/160
14 Air inlet, external wall F
DN 110/160
15 PP wall outlet, external wall F
16 Wall plate 160
17 Balanced flue routing horizontal
incl. cowl
18 Connection to flue gas chimney
B33, Length 250 mm with air
apertures
19 Support bend 87°, DN 110
for connection to a flue in a duct
20 Support rail
Ventilation air aperture for room sealed operation
according to TRGI 150 cm² or 2 x 75 cm².
3062555_201804
28. Technical information
9
6
7
7a
6
8
10
5
10
5
4
3
2
1
Type C33x: Gas condensing boiler with combustion air and flue gas
Notes:
3
3a
5
6
2
1
routed vertically via the roof.
Lubricate the pipe ends and gaskets for easi-
er installation.
Check the required inspection piece
(3), (3a) (Part No.: 2651329) with your local
flue gas inspector prior to installation.
9
9
6
6
5
4
5
4
5
11
3
2
1
51