Hardware Test - Mitsubishi Electric FX5-ENET User Manual

Melsec iq-f series
Hide thumbs Also See for FX5-ENET:
Table of Contents

Advertisement

9.4

Hardware Test

This section describes how to perform a test related to hardware, such as a ROM/RAM of the FX5-ENET.
• During the hardware test, values in the buffer memory cannot be referred from the GX Works3 or the
program.
• Do not change the operating status of the CPU module during the hardware test. If the operating status of
the CPU module is changed, the module major error occurs in the CPU module.
Operating procedure
1.
Set the FX5-ENET to the hardware test mode using the GX Works3.
[Navigation window]  [Parameter]  [Module Information]  [FX5-ENET]  [Indispensable Setting]  [Mode Settings]
 Select "Hardware Test"
2.
When a cable is connected to the Ethernet port of FX5-ENET, disconnect it.
3.
Set the CPU module (FX5-ENET) to the STOP state and write parameters.
4.
Power off and on the system or reset the CPU module (FX5-ENET).
5.
The hardware test is automatically executed.
The following table shows the LED indications of the FX5-ENET for the hardware test.
Status
During hardware test execution
Hardware test completed successfully
Hardware test completed with an error
6.
When the test completed successfully, set the FX5-ENET to online mode using the GX Works3.
[Navigation window]  [Parameter]  [Module Information]  [FX5-ENET]  [Indispensable Setting]  [Mode Settings]
 Select "Online"
Write parameters and power off and on the system or reset the CPU module (FX5-ENET).
7.
When the test completed with an error, check that adequate measures to reduce noise are taken for the programmable
controller system and retry the hardware test. If the test still completes with an error, a hardware failure may have
occurred on the FX5-ENET. Please consult your local Mitsubishi representative.
9 TROUBLESHOOTING
52
9.4 Hardware Test
RUN LED
Flashing
On
On
ERROR LED
Off
Off
On

Advertisement

Table of Contents
loading

Table of Contents