Schwinn Airdyne AD2 Service Manual page 22

Hide thumbs Also See for Airdyne AD2:
Table of Contents

Advertisement

6.
When the Speed Sensor (A) is past the bottom opening (D) in
the tube, use the hook to catch the data cable. Carefully pull out the
Speed Sensor and cable through the opening.
7.
Install the new Speed Sensor (A) to the Main Frame.
Reinstall the Console.
8.
NOTICE: Do not crimp the cable.
9.
Reinstall the Shrouds and Pedals.
Note: Before fully attaching the Shrouds, verify that the Speed
Sensor (A) and Speed Sensor Magnet (E) on the Drive
Pulley do not touch.
10. Final Inspection
Inspect your machine to ensure that all hardware is tight and
components are properly assembled.
Do not use until the machine has been fully assembled and
inspected for correct performance in accordance with the
Owner's Manual.
B
D
A
22

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents