Table of contents Table of contents About these instructions for use Target groups Labelling of notes About this translated version Product information Intended use 2.1.1 Areas of use Product description 2.2.1 Overview 2.2.2 Compatible components Handling Assembly information 3.1.1 Installation dimensions Assembly 3.2.1 Mounting module...
This restriction does not extend to possible operating instructions. The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use.
About these instructions for use About this translated version This instruction for use contains important information about the choice of product or system, assembly and commissioning as well as intended use and, if required, maintenance measures. The information about the products, their properties and application technology are based on the current standards in Europe (e.g.
Product information 2 Product information Intended use 2.1.1 Areas of use The Prevista Dry Plus urinal module is designed for mounting in a Pre‐ vista Dry Plus pre-wall construction. Product description 2.2.1 Overview Fig. 1: Components and scope of delivery Urinal module Screws for fixing in support profile slot nuts...
Handling Assembly 3.2.1 Mounting module Secure the module onto the open mounting rail with the slot nuts supplied: Insert the slot nut into the opening of the module. Push the slot nut in until it engages. Set the height of the rails. Prevista Dry Plus urinal module 8 from 12...
Page 9
Handling Fasten the slot nut. 25 Nm Bend the sides of the metal bars of the rails. Bend the sides of the metal bars of the fitting holder. Bend the sides of the metal bars of the drain elbow. Prevista Dry Plus urinal module 9 from 12...
Page 10
Handling Set the height of the module according to the ceramic manufactur‐ er's instructions. The projection of the carriers beyond the rails is maximum 1.5 mm. Prevista Dry Plus urinal module 10 from 12...
Handling 3.2.2 Setting up and cladding the module Mount a drain elbow. Turn in the threaded rods by hand. Tighten the nuts of the threaded rods with a fork spanner. Place the protective caps on the threaded rods. Make the water connections. Cut out the recesses for the drain elbow and the threaded rods.
Handling Clad the module with suitable gypsum cardboard cladding panels. Disposal Separate the product and packaging materials (e. g. paper, metal, plastic or non-ferrous metals) and dispose of in accordance with valid national legal requirements. Prevista Dry Plus urinal module 12 from 12...
Need help?
Do you have a question about the PreVista Dry Plus 8565 and is the answer not in the manual?
Questions and answers