ID Technology 250 Operator / Technical Manual page 128

Print and apply
Table of Contents

Advertisement

TS9100
M20 HEX HEAD BOLT
M6 SOCKET HEAD CAP SCREW
LEVELING BRACKET
INSTALLATION INSTRUCTIONS
M8 SOCKET HEAD CAP SCREW
1. REMOVE THE M20 HEX HEAD BOLT.
2. REMOVE THE TWO M6 SOCKET HEAD CAP SCREWS.
3. PLACE THE TS9100 IN POSITION USING THE M20
HEX HEAD BOLT AND THE TWO M6 SOCKET HEAD CAP SCREWS.
4. FASTEN THE LEVELING BRACKET TO THE U-ARM WITH M8
SOCKET HEAD CAP SCREW.
menmi
8/8/2005
ID TECHNOLOGY
DETAIL A
PRECISION LEVELING
ASSEMBLY
C
TS9100 Installation

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for ID Technology 250

Table of Contents