Configuration
6.2 Configuring the busbar run layout
6.2.1.4

Fire barrier

Overview
If the busbar trunking system is routed through a fire wall or ceiling, it must have a fire
barrier. Depending on requirements, the fire barrier can be fully mounted on the trunking unit
at the factory, or it can be supplied separately as a stand-alone type for mounting by the
customer. The following configuring guidelines apply for both forms of delivery:
Fire barrier mounted at the factory
Engineering
Observe minimum dimensions and guidelines.
Define the positioning of the fire barrier in the fire
wall and specify the configuring dimension (X*) in
the type suffix.
Ordering type
Type suffix + LX ..-S120-X(Y*), approval kit LX-
S120-ZUL-D (only required for Germany)
Installation
Mounting on the trunking unit takes place in the
factory.
On site it is only necessary to install the trunking
unit with fire barrier in the fire wall/fire ceiling.
Installation tasks and creation of the declaration
of agreement in accordance with the approval kit
(usually only required within Germany)
1)
2)
The fire barrier meets the requirements of IEC/EN 60439-2 and fire resistance class S120 in
accordance with DIN 4102 Part 9, ISO 834.
106
Fire barrier for customer installation can only be mounted on the single systems
LX.01... to LX.07....
When using the LX fire barrier within Germany, the approval kit LX-S120-ZUL-D (BVP.:
611370) must also be ordered and supplied along with the fire barrier.
Fire barrier that can be mounted by the customer
2)
Observe minimum dimensions and guidelines.
The fire barrier is not positioned in the fire wall until
installation. The dimension X* does not apply in the
type designation.
Stand-alone type LX ..-S120-MOS, approval kit LX-
S120-ZUL-D (only required for Germany)
Installing the barrier in the trunking unit on site:
Sealing of the profile contours with mineral wool
Installing the inner fire barrier collar (four Promat
plates)
Installing the outer fire barrier collar (four Promat
plates)
Installing the four front Promat plates
The promat plates are fixed with the help of
screws.
Sealing of the outside joints using fire barrier
sealant in accordance with the scope of delivery.
Drafting of declaration of agreement for installed
fire barrier by the engineer installing the fire
barrier.
Component parts of the scope of supply:
12 Promat plates
Mineral wool
Fixing screws
Sealant.
After installation of the fire barrier on the trunking
unit, the whole is installed in the fire wall/fire ceiling).
Installation tasks and drafting of the declaration of
agreement in accordance with the approval kit
(usually only required within Germany)
SIVACON 8PS - Configuring with LX system
Configuration Manual, 10/2011, A5E02194899-02
1)2)