Engineering manual
describes the process of testing an IED in a substation which is not in service. The
chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service
and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has
been commissioned. The manual provides instructions for the monitoring,
controlling and setting of the IED. The manual also describes how to identify
disturbances and how to view calculated and measured power grid data to
determine the cause of a fault.
The application manual contains application descriptions and setting guidelines
sorted per function. The manual can be used to find out when and for what purpose
a typical protection function can be used. The manual can also provide assistance
for calculating settings.
The technical manual contains operation principle descriptions, and lists function
blocks, logic diagrams, input and output signals, setting parameters and technical
data, sorted per function. The manual can be used as a technical reference during
the engineering phase, installation and commissioning phase, and during normal
service.
The communication protocol manual describes the communication protocols
supported by the IED. The manual concentrates on the vendor-specific
implementations.
The point list manual describes the outlook and properties of the data points
specific to the IED. The manual should be used in conjunction with the
corresponding communication protocol manual.
The cyber security deployment guideline describes the process for handling cyber
security when communicating with the IED. Certification, Authorization with role
based access control, and product engineering for cyber security related events are
described and sorted by function. The guideline can be used as a technical
reference during the engineering phase, installation and commissioning phase, and
during normal service.

Document revision history

Document revision/date
–/May 2017
A/October 2017
B/November 2017
C/March 2018
D/June 2018
GUID-C8027F8A-D3CB-41C1-B078-F9E59BB73A6C v7
History
First release
Information updated
ZMFPDIS and ZMFCPDIS - Added missing
setting tables
2.2 Maintenance release 1
Added new functions and resolved bugs
Section 1
Introduction
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents