INSTALLATION

All the "left", "rght", "front", "rear" drectons
n ths manual are as vewed by the operator
when facng the man electrcal enclosure.

LOCATION

1.
Position the machine to allow adequate space for all
your sawing needs with maximum convenience.
2.
Locate the machine to provide sufficient clearance
for: (a) Material loading and unloading; (b) All
door openings; (c) Head elevation; (d) Head swivel;
(e) Coolant reservoir removal; (f) Chip trough or
optional chip auger removal; (g) Maintenance and
lubrication procedures; (h) Operation of the any
supplied machine accessories.
3.
Approximate floor dimensions for the machine are
shown on pages 1, 2 and 3.
4.
Accessories such as roller stock conveyors will
require additional working area.

UNPACKING

1.
The machine and other parts and supplies were
fastened to a wooden skid before shipment.
DO NOT remove the red metal bracket holdng
the saw head to the vse base untl the
machne has been lfted and postoned at ts
permanent locaton.
2.
Remove all protective covers, strapping, crating, etc.
Then: (a) Remove the bolts or screws attaching the
machine to the shipping skid.
3.
Inspect the machine for broken or damaged parts.
Refer to this manual's inside front cover for damage
claim procedures.

CLEANING

1.
If necessary, use solvent to remove the rust-
preventative coating applied to the machine's
exposed bare metal surfaces before shipping.

LIFTING

Never lft the machne by ts sawng head.
1.
Lift pockets, located on either side of the lower
portion of the base weldment, are provided for lifting
purposes.
2.
Using a fork lift truck, lift the machine by using the
lift pockets to move the machine to its permanent
location. The forks should be a minimum of six
(6) feet (2 meters) long to sufficiently support the
machine.
3.
Net weight for the machine base is approximately
5000 pounds (2268.0 kg). The indexer weighs
approximately 3000 pounds (1360.8 kg). Added
features and options may increase the weight by
as much as 500 pounds (226.8 kg).
The use of an overhead host s NOT
recommended.
4.
Optional roller stock conveyors can be lifted into
position using a fork lift or other means that provides
adequate safety precautions.

OSHA NOTICE!!

OSHA Regulaton No. 1910.212 (5B).
Machines designed for a fixed location shall
be securely anchored to prevent walkng or
movng.

MACHINE INSTALLATION

1.
There are two (2) parts to the machine: the machine
base and the indexer. The machine base is installed
first and leveled before the indexer.
2.
Before placing the machine down, install one (1)
M20 leveling screw and nut into each base foot
pad. Then: (a) Adjust the six (6) leveling screws
to extend an equal distance through the mounting
pad - approximately one-half inch (12.7 mm); (b)
Tighten the jam nuts; (c) Just before lowering to the
floor, place a foot casting under each leveling screw
Now lower the machine in the desired location.
3.
Remove the bracket holding the saw head to the
base. Save ths bracket for use n case machne
relocaton becomes necessary at a future
date.
4.
Place a machinist's level on the vise bed. Then
adjust the leveling screws until the vise base wear
plates are level in both directions and weght of
the machne s restng evenly on all mountng
pads.
5.
Repeat Step 2 for the indexer and engage the
indexer with the locating pins on the machine
base.