Installation; Location; Osha Notice; Unpacking - DoAll TF-2525 Instruction Manual

Universal tilt-frame band machine
Table of Contents

Advertisement

INSTALLATION

All the "left", "rght", "front" and "rear"
degnatons n ths manual are as vewed by
the operator facng the machne's control
console.

LOCATION

1.
The floor area required by the machine with allowance
for 45° left and right head tilt is approximately 95.50
inches (2425.7 mm) in width by 107.00 inches 2717.8
mm) in length. Standard machine height is 103.00
inches (2616.2 mm). Refer to pages 1, 2 and 3 for
further machine dimensions.
2.
Locate the machine to provide adequate space for
your sawing needs. Be sure to provide sufficient
clearance for: (a) Loading and unloading of
stock; (b) Door openings, head tilting and power
unit placement; (c) Maintenance and lubrication
procedures; (d) Operation of the machine
accessories, if applicable.
3.
Provide ample space for roller conveyors and/or
other material handling equipment.

OSHA NOTICE!!

OSHA Regulaton 1910.212 (5B).
Machines designed for a fixed location shall
be securely anchored to prevent walkng or
movng.

UNPACKING

1.
The machine is fastened to and shipped on a wooden
skid. Overseas shipments are also crated.
2.
Carefully remove all protective covers, strapping,
hold-down brackets, crating, etc. Then: (a) Remove
all bolts which fasten the machine to the shipping
skid; (b) DO NOT remove the head support bracket
until the machine is placed in desired position; (c)
Check around the machine for other removable
brackets, extra machine parts or supplies which
might have been placed there for shipment; (d)
Inspect the machine and all parts for shipping
damage.
Claim procedures are listed on this
manual's inside front cover.

CLEANING

1.
If necessary, use solvent to remove rust-preventive
coating applied to exposed bare metal surfaces
before shipment.
DO NOT use compressed ar for cleanng
purposes as ths may force drt and deprs
nto the machne's workng parts.

LIFTING

NEVER lft the machne by ts sawng head.
1.
Use of an overhead hoist with chain hooks is
recommended to lift and transport the machine into
its final position. Net weight is approximately 6200
pounds (2812.3 kg).
2.
Place the chain hooks into the base openings (there
is three (3) openings on each side). Be sure to
pad areas where the chains may rub and damage
machine surfaces.
3.
The hydraulic power unit, conveyors and/or
material handling equipment (if supplied as
optional equipment) can be lifted and transported
by overhead hoist, fork lift, or by other means that
provides adequate safety precautions.

FLOOR INSTALLATION and ALIGNMENT

1.
Place the machine in desired position and then
remove the head support bracket that connects the
saw head to the machine frame. Remove the two (2)
carriage brackets located in the rear of the machine
behind the electrical control box enclosure.
2.
Place a level on the machine roller table bed. Insert
the 3/4-10NC leveling screws into the mounting pads
and make final adjustments to level the machine in
both directions. Make sure weight bears evenly on
all mounting pads.
3.
Position the roller conveyors and/or material
handling equipment and attach if necessary to the
machine frame. Adjust the leveling screws so that
the conveyor rollers are in the same plane as the
table rollers and weight bears evenly on all legs.
7

Advertisement

Table of Contents
loading