A progress bar shows during the span gas calibration.
(11) When span gas calibration is complete, the "Results"
screen shows. Select "Continue".
(12) On the "Calibration Complete" screen, do one of the
following:
a) To do a span gas calibration for another gas, select
"Select Another Gas". Repeat Steps (3) through
(11).
b) To return to the "Results" screen, select "Back".
c) "To go to the next step, select "Continue".
(13) Close the span gas cylinder valve.
(14) On the "Set Reminder" screen, select the applicable
button for the calibration interval. At the selected
interval, a pop-up will signal the need for calibration.
(15) Select "Next".
(16) On the bottom of the device, install the pin in the cali-
bration port.
(17) Remove the tubing from the calibration port.
Chillgard 5000
Calibration
US
40