Appendix A Making Connections To The Indicator; Load Cell Connections - OHAUS CKW-55 Instruction Manual

Ckw series scale
Table of Contents

Advertisement

CKW-55 CHECKWEIGHER
A. MAKING CONNECTIONS TO THE INDICATOR
The CKW-55 Indicator housing contains 4 liquid-tight connectors at the bottom for external cabling. Figure A-1 illustrates the
locations of the liquid tight connectors.
A.1 LOAD CELL CONNECTIONS
Figure A-2 illustrates the locations of the printed circuit board connections.
Unfasten the four side screws of the indicator housing. Pull the front cover forward. Pass the load cell cable through the
liquid-tight connector at the bottom and center of the housing. Pass the cable through the large ferrite bead that is attached
to the internal plastic clip.
APPENDIX A
I/O
Figure A-1. Cable Entry Identification.
Figure A-2. Printed Circuit Board Connections.
CAUTION: ELECTRICAL SHOCK HAZARD. REMOVE ALL POWER CONNECTIONS TO
THE INDICATOR BEFORE SERVICING OR MAKING INTERNAL CONNECTIONS.
THE HOUSING SHOULD ONLY BE OPENED BY AUTHORIZED AND QUALIFIED PERSONNEL,
SUCH AS AN ELECTRICAL TECHNICIAN.
LOAD
AC POWER
I/O
CELL
..
..
..
EN-53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents