4-3) Second stage

Mount the servo amplifier to the host controller and mount the servomotor to the machine to perform
test operation. The test operation should be conducted in the final operation state.
Check the following items in the second stage.
<Items to be checked>
1. Wiring between servo amplifier and host controller
2.Installation of servomotor to mechanical system
3.Check of parameters #1 through #4
No.
Name
01
Command pulse correction α
02
Command pulse correction β
03
Pulse string input form
04
Direction of rotation switch
n Test operation procedure
(1) Referring to section 2-1 "Servomotor," mount the servomotor to the machine securely. (Mount
securely without play or deflection.)
(2) Adjust the host controller and servo amplifier. (Check parameters #1 through #4. Refer to section
5-3 "Basic settings.")
(3) According to description in Chapter 6 "Adjustment of servo," adjust the parameters of the servo
amplifier.
If no fault is found in the second stage, the test operation is complete.
Setting range
1 to 32767 (in 1 increments)
1 to 32767 (in 1 increments)
0: Command pulse and
command sign
1: Forward or reverse rotation
pulse
2: Two signals with 90-degree
phase difference
0: Forward rotation (CCW)
1: Reverse rotation (CW)
4-5
TEST OPERATION
Initial
Change
value
8
Always
1
Always
1
Power
0
Power
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents