4.2.4

Shutdown at High Voltage

Shutdown at high voltage settings
Enable
High Limit: _ V
Delay: _ seconds
NOTE
For new parameters to take effect, you must click on
follow procedure instructions. Please refer to the relevant section for details.
PB-2500J-PCIe/ CSM
If the "Enable" box is checked, the shutdown process will be
determined by the High Limit: _ V and Delay: _ seconds
settings.
If the "Enable" box is checked, the shutdown process will be
initiated by high voltage limit setting (High Limit: _ V) and the
Delay: _ seconds.
If the "Enable" box is checked, the shutdown process will be
initiated in _ seconds (Delay: _ seconds) when the high
voltage limit setting (High Limit: _ V) is reached.