Stf File Status - Epson PP-100II Technical Reference Manual

Td bridge
Hide thumbs Also See for PP-100II:
Table of Contents

Advertisement

STF File Status

The table below lists the contents (job statuses) written in the STF file.
Section name
Key name
ACTIVE_JOB
JOB[N]
* [N] stands for a
number that starts
from 1.
COMPLETE_JOB
JOB[N]
* [N] stands for a
number that starts
from 1.
[JOB_ID]
PUBLISHER
A job ID becomes
the section name.
This section is added
STATUS
for each registered
job.
When publishing
from another TD
Bridge, completed
jobs are not written.
PUBLICATION_NUMBE
(*1)
R
COMPLETION_NUMBE
(*1)
R
ERRORDISC_NUMBER
(*1)
(*1)
TYPE
IN_STACKER
OUT_STACKER
ESTIMATION_TIME
ERROR
76
Explanation
Among the jobs that TD Bride has
received, job IDs being processed or
waiting to be processed are output.
The job ID being processed is output first,
followed by the job IDs waiting for
processing in the order of execution.
Job ID is written from a job completed
most recently.
(*1)
The specified publishing machine name
is written.
An ID that represents the job status is
written.
The specified number of discs to be
published is written.
The number of published discs is written.
The number of published discs that are
completed abnormally is written.
An ID that represents the job type is
written.
(*1)
The specified source stacker is written.
(*1)
The specified output stacker is written.
(*1)
An estimated operating time for
completing the job. This is not the
estimated time of completion. (Jobs with
the error rate measurement setting only
are not written.)
This indicates a code of error that is
occurring with the ongoing job.
When the error is cleared, the error code
is deleted when the STF file is updated.
The "ERROR" always appears even when
no error is occurring.
Output values that indicate
status
Job IDs of jobs being processed or being
put in standby
When publishing a job from another TD
Bridge, the value which has a unique
identification for the job ID and TD
Bridge.
Job IDs of completed jobs (including jobs
finished abnormally)
Job IDs for jobs published from other TD
Bridge are not written.
Publishing machine name. This key is not
written to the file when the machine
name is unknown.
Being registered or put in standby: "1"
Being processed: "2"
Being paused: "3"
Completed: "4"
Completed abnormally: "5"
Being not accepted: "6"
Unknown: "99"
The number of discs to be published
Unknown: "-1"
The number of published discs
Unknown: "-1"
The number of published discs that are
completed abnormally
Unknown: "-1"
Only burning data or burning and error
rate measurement: "1"
Only printing data: "2"
Burning and printing, or burning,
printing, and error rate measurement: "3"
Only error rate measurement: "4"
Unknown: "99"
Stacker 1: "1"
Stacker 2: "2"
Stacker 1 and 2: "1,2"
Unknown: "-1"
Stacker 2: "2"
Stacker 4: "4"
Stacker 2,3: "2,3"
Unknown: "-1"
An estimated time period from when
starting the job to when finishing it is
written in increments of one second.
(This key is not written for completed
jobs and when the time is unknown.)
See "Error Codes and Remedies".
Change
timing
When a job is
accepted/
completed
When a job is
completed
When a job is
started
Each time the job
status changes
When a job is
started
When a job is
started
Each time a disc is
published
Each time an error
disc is published
When a job is
started
When a job is
started
When a job is
started
When a job is
started
Each time an error
occurs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pp-100Pp-100apPp-50bdPp-7050bdPp-100n

Table of Contents