Product Description Areas of application System Overview Functions FCS-320 Series Aspirating Smoke Detectors and Accessories 3.5.1 Overview 3.5.2 FCS-320 series connections 3.5.3 FCS-320-TP1/FCS-320-TP2 displays 3.5.4 FCS-320-TT1/FCS-320-TT2 displays 3.5.5 FAS-ASD-DIAG Diagnostic Software 3.5.6 Remote indictors 3.5.7 Device mounting 3.5.8 Measures for Reducing Operating Noise Pipe system components 3.6.1...
Page 4
Connection to the Fire Panel 5.6.1 Electrical Connection 5.6.2 FCS-320-TP1 / FCS-320-TT1 Connection to the Fire Panel 5.6.3 FCS-320-TP2 / FCS-320-TT2 Connection to the Fire Panel DIP switch settings Connecting an External Detector Alarm Display Data Logging 5.10 Replacing a Detector Module...
Page 5
With detonation safety barrier Planning with air filter 9.3.1 Without any other pipe accessories 9.3.2 With water separator 9.3.3 With detonation safety barrier Test Log FCS-320 Series Aspirating Smoke Detectors Index Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Caution! This symbol warns against actions and behavior which, if disregarded, could cause property damage. Warning! This symbol warns against actions and behavior which, if disregarded, could cause personal injury. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Arbitrary constructional changes to the smoke aspiration system – Acts of God. Bosch Sicherheitssysteme GmbH, hereinafter referred to as Bosch, assumes no liability for damage or malfunction arising through failure to comply with this operation guide. Caution! The equipment may only be installed by authorized and qualified personnel! Copyright The copyright to this operation guide remains with Bosch.
This effectively doubles the monitoring area. Dual-detector dependency The use of two detector modules in variants FCS-320-TP2 and FCS-320-TT2 also enables a dual-detector dependency to be realized. This means that one area can be monitored by two pipe systems.
Page 10
Monitoring options for an air-conditioning unit or an air- conditioning duct (depiction of principle) The FCS-320 Aspirating Smoke Detector can be used for early fire detection in areas with special-purpose air conditioning. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 11
FCS-320 series are therefore especially suitable for areas of application: – Where early intervention is essential due to a high value concentration – Where equipment must always be operational Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Various delay times can be programmed for the alarm thresholds, as well as for displaying and transferring malfunctions. Alarm messages are saved and are reset after the cause has been eliminated. LOGIC · SENS 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 13
Calibrating the airflow sensor Automatic airflow sensor calibration makes it significantly easier to start the FCS-320. The initialization phase is carried out according to or independently of the air pressure as desired. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
DIP switch for address setting – Supplementary package with cable bushings (1 x M20, 2 x M25) – FCS-320-TP1 /FCS-320-TP2: optical displays for alarm, malfunction and operation – FCS-320-TT1 /FCS-320-TT2: smoke level display(s), optical displays for info, pre and main alarm, malfunction and operation –...
Pipe system 1 connection For Ø 25 mm pipe system Pipe system 2 connection For Ø 25 mm pipe system (for FCS-320-TP2 and FCS-320-TT2 only) Connection for air-return pipe Cable bushing for connection of fire panel 2 x M 25 for cable diameters of and additional power supply (input/ 9 - 14 mm (expandable to 14 -...
Green Operation display Alarm Alarm indication Fault Yellow Fault – in the pipe system – of a detector module – caused by fan failure Two alarm displays on the FCS-320-TP2 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
The external detector alarm display is installed in an obvious place in halls or entrances of the building section or areas concerned. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
100 mm long into the air outlet opening of the unit. This is done by breaking out the pre-punched opening in the protective grille (e.g. using a small edge cutter). Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
In areas that are susceptible to dust particles or icing, it may be necessary to blow out the aspiration pipe system and its air sampling openings. The figure below shows a manual blowing-out system with a three-way tap. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Air sampling opening with aspiration reducing film sheet and marking tape Aspiration reducing clips In areas susceptible to obstructions or icing, special, patented ASD aspiration clips with flexible aspiration reductions are used (see figure below). Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
This requires the pre-punched opening in the protective grille to be broken out. Caution! The air-return pipe of the smoke aspiration system should not exceed 2 m. Longer returns must be checked individually. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
The FAS-ASD-WS Water Separator is integrated at the lowest point in the pipe system downstream of the air filter and the aspirating smoke detector. The 45° pipe elbow permits optimum distance from the wall. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
This depends on the composition, concentration, temperature, and pressure of the flammable mixture. The detonation safety barrier is a flame trap that is flame-proof in the face of pipe explosions (deflagrations) and detonations. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Three-way tap, incl. fittings, for 25 mm pipe system F.01U.029.718 FAS-ASD-F Flange for ventilation duct F.01U.029.722 FAS-ASD-AR Aspiration reduction, with 10 mm bore for attaching an F.01U.029.724 aspiration reducing film sheet, 10 per set 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 27
Aspiration reducing film sheet 5.6 mm AF-5.6, 10 units. 4.998.143.430 Aspiration reducing film sheet 6.0 mm AF-6.0, 10 units. 4.998.143.431 Aspiration reducing film sheet 6.8 mm AF-6.8, 10 units. 4.998.143.432 Aspiration reducing film sheet 7.0 mm AF-7.0, 10 units. 4.998.143.433 Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
310 mA – On alarm, fan voltage 6.9 V 230 mA 290 mA – On alarm, fan voltage 9 V 290 mA 370 mA Mechanics Displays on the device FCS-320-TP1/FCS-320-TP2 – Operation Green LED – Fault Yellow LED – Alarm 1 red LED/2 red LEDs Displays on the device FCS-320-TT1/FCS-320-TT2 –...
Plastic housing with manual drain valve Sintered metal filter PG cable glands for 25 mm pipe system Incl. assembly bracket Dimensions (H x W x D) 210 x 170 x 90 mm Weight Approx. 1.4 kg Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 30
Operating pressure Max. 10 bar Housing material PVC plastic Seal Teflon (PTFE) Length 131 mm Application temperature 0 °C to +50 °C range Ceiling lead-through (FAS‑ASD‑CLT) with aspiration hose (FAS‑ASD‑AHC) Maximum false ceiling 35 mm thickness 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 31
Max. length of aspiration 1 m hose per ceiling lead- through Ceiling lead-through fitting material Aspiration hose material Color of aspiration hose White and ceiling lead-through Application temperature -40 °C to +80 °C range Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
– The number of air sampling openings and the length of the shortest and longest pipe branch within the pipe system must not exceed a quantity ratio of 1:2. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 34
M-pipe: pipe system that branches into three pipe branches. – Double U-pipe: pipe system that branches symmetrically into four pipe branches. – Quadruple U-pipe: pipe system that branches symmetrically into eight pipe branches. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 35
If the pipe system does not correspond to the planning guidelines described here owing to structural circumstances, it must be calculated separately for the case in question on request. Testing Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
The activation threshold and thus the sensitivity of the airflow sensor can be set on 4 levels. Breakages and obstructions must be accurately detected in the event of a malfunction. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Standard Pipe Planning can be determined for each classification.Smoke aspiration systems with a higher fire sensitivity class according to EN 54‑20 or ISO 7240-20 also satisfy the requirements of the lower classes. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Minimum pipe length between 2 air sampling openings 12 m The maximum monitoring area of an air sampling opening corresponds to the monitoring area of point-type detectors in accordance with the applicable planning guidelines. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
The values for the maximum number of air sampling openings, the maximum pipe length and the maximum overall monitoring areas apply for each pipe system. Two pipe systems can be connected to aspirating smoke detectors FCS-320-TP2 and FCS-320-TT2, each with two detector modules.
Page 40
You will find the planning tables in question in Planning without filter and Planning with air filter. Abbreviation Meaning Detector module DM‑01(05) DM-TP-01(05) DM‑10(25) DM-TP-10(25) DM‑50(80) DM-TP-50(80) Sensitivity (% LT/m) Main alarm Pre-alarm l [m] Permissible total pipe length in meters 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 41
0.03 (0.1) M 0.06 (0.2) M 0.12 (0.4) M 0.1 (0.25) M (25) 0.2 (0.5) 0.4 (1) 0.8 (2) 0.313 PA A (80) (0.5) 0.5 (0.8) 0.687 PA A (1.1) 1.0 (1.6) Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 42
2 x U ≥9 4 x U (1 ≥9 With water separator Number of air sampling openings Pipe … Fans shape l [m] ≥9 ≥9 ≥9 2 x U ≥9 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 43
The diameters of the air sampling openings should be taken from the relevant table for each pipe configuration: 1 pipe system FCS-320-TP1 FAS / FCS FCS-320-TT1 2 pipe systems FCS-320-TP2 FCS-320-TT2 I-pipe system for space protection Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 45
Max. distance between 2 air sampling openings 12 m Max. number of air sampling openings (n) per pipe system U-pipe system Air sampling Number of air sampling openings opening ∅ air sampling opening in mm Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 46
With high fan voltage 180 m Min. distance between 2 air sampling openings 4 m Max. distance between 2 air sampling openings 12 m Max. number of air sampling openings (n) per pipe system 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 47
With high fan voltage 200 m Min. distance between 2 air sampling openings 4 m Max. distance between 2 air sampling openings 12 m Max. number of air sampling openings (n) per pipe system Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 48
With high fan voltage 300 m Min. distance between 2 air sampling openings 4 m Max. distance between 2 air sampling openings 12 m Max. number of air sampling openings (n) per pipe system 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
With high fan voltage 80 m Min. distance between 2 air sampling openings 4 m Max. distance between 2 air sampling openings 12 m Max. number of air sampling openings (n) per pipe system Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 50
III. Notice! When planning in accordance with EN 54‑20 or ISO 7240-20, level I or II must always be set for airflow monitoring. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 51
Max. number of air sampling openings (n) per pipe system U-pipe system Air sampling opening Number of air sampling openings Ø air sampling opening in mm Punch diameter of the aspiration reducing film sheet Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 52
FAS / FCS 1 pipe system FCS-320-TP1 FCS-320-TT1 2 pipe systems FCS-320-TP2 FCS-320-TT2 FAS / FCS M-pipe system for space protection Limiting values Min. distance FCS-320 – last T-fitting 4 m 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 53
I. Notice! When planning in accordance with EN 54‑20 or ISO 7240-20 , level I or II must always be set for airflow monitoring. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 54
Punch diameter of the aspiration reducing film sheet Double U-pipe system activation thresholds per pipe system Activation Number of openings thresholds 1 obstructed opening — — 2 obstructed openings — 3 obstructed openings 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Max. overall pipe length (Ø 25 mm) 40 m Min. distance between air sampling openings 0.1 m Max. distance between air sampling openings 4 m Max. number of air sampling openings (n) per pipe system Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 56
Max. number of air sampling openings (n) per pipe system U-pipe system Number of air sampling openings Ø of all air sampling openings in Punch diameter of the aspiration reducing film sheet 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 57
Max. number of air sampling openings (n) per pipe system M-pipe Number of air sampling openings Ø of all air sampling openings in mm Punch diameter of the aspiration reducing film sheet Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Pipes with a 40 mm diameter are required for planning pipe feed line A. Area B is designed with 25 mm pipes in accordance with Standard Pipe Planning. The plan applies for the pipe configurations described above. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
If required, this reduction can be offset as follows: Method of resolution Primarily used in Increasing the sensitivity of the detector Previously installed systems module Reducing the number of air sampling Systems currently being planned openings Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 60
1. Option: increasing the sensitivity, page 60, the necessary sensitivity of the detector module in this case is 0.25 % LT/m * 0.85 = 0.1875 % LT/ 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 61
For the design of pipe systems with acceleration apertures, please refer to the following table for aspiration holes and particular pipe configuration. Furthermore compliance is required with special design tables for the design of smoke aspiration systems with acceleration apertures Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 62
Due to physical properties, the detection of pipe rupture is derated when using pipe systems with acceleration apertures. I-Pipe FAS/FCS * acceleration aperture Number of apertures Sampling aperture type Ax-x.x 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 63
Aspirating Smoke Detector Planning | en a = Acceleration openings = 7.0 mm Number of apertures Sampling aperture type Ax-x.x 7.0- a = Acceleration openings = 7.0 mm U-Pipe FAS/FCS Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 64
| Planning Aspirating Smoke Detector * acceleration aperture Number of apertures Sampling aperture type Ax-x.x a = Acceleration openings = 7.0 mm Number of apertures Sampling aperture type Ax-x.x 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 65
Aspirating Smoke Detector Planning | en a = Acceleration openings = 7.0 mm M-Pipe FAS/FCS * acceleration aperture Number of apertures Sampling aperture type Ax-x.x Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 66
| Planning Aspirating Smoke Detector a = Acceleration openings = 7.0 mm Number of apertures Sampling aperture type Ax-x.x 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 67
Aspirating Smoke Detector Planning | en a = Acceleration openings = 7.0 mm Double-U-Pipe FAS/FCS * acceleration aperture Number of apertures Sampling aperture type Ax-x.x Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 68
| Planning Aspirating Smoke Detector a = Acceleration openings = 7.0 mm Number of apertures Sampling aperture type Ax-x.x 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Flow speed Maximum 6 to 10 m/s > 10 m/s ducts Duct cross-section Large Small Difference pressures High along the flow direction The speed distribution in an air-conditioning duct appears as follows: Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 70
(see Installation location of the pipe system , page 70) must be provided. – The pipe entries into the duct must be airtight. – The portion of the pipe system that is outside the duct must be sealed airtight. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 71
≤ 0.5 m² section > 0.5 m² Distance of the air sampling openings 100 to 200 mm 200 to 300 mm to the wall Distance of the air sampling openings 100 mm 150 mm to one another Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Ducts with small and large duct cross-sections 4.12 Project planning with branch pipes Project planning with branch pipe are suitable for sampling points which are located distantly from the main run of the pipe system. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 73
Opening diameter The opening diameters are valid for the projected aspiration apertures in accordance with the chapter „Opening diameter for standard project planning“. FAS / FCS Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
FAS/FCS aspirating smoke detector with a fan voltage of 6.5 V. In accordance to the project planning scale, the allowed total length of pipe can be 120 m for the 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
50 m. The result for the maximum air sampling pipe is: Air sampling pipe length = 50 m – (10 m * 1.6) = 48.4 m) Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Notice! The power supply units are laid out using the calculated total current Ig with the highest value. Please refer to Technical Specifications for the current consumption of the FCS-320. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 77
– M 25 cable bushing: ∅ 9-14 mm – M 20 cable bushing: ∅ 8-12 mm The "Fire Alarm System Planning Software" enables case-specific calculations to be carried out for planning the FPA-5000 Modular Fire Panel. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Ground yourself using a wrist strap or take other suitable measures. Proceed as follows to install the detector module: – Open the unit by carefully unlocking the housing cover's quick locks. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
– Connect detector module 1 to the "HEAD1" connection on the motherboard using the flatband cable. FCS-320-TP2 and FCS-320-TT2 variants: Connect detector module 2 to the "HEAD2" connection on the motherboard using the flatband cable. –...
The air outlet on the unit must not be obstructed. There must be a free area of 10 cm in front of the air outlet. The aspirating smoke detector can be installed with the aspiration device pointing upwards or downwards. Rotate the cover through 180° in the required direction. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 81
– Head diameter: 5 to 7 mm Bore distances The distances between the bores are shown in the figures below (all measurements in mm). Figure 5.2: Bore distances of FCS-320 without mounting Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 82
Connecting the aspiration pipe – To connect the aspiration pipe to the FCS-320, insert it into the pipe connection provided. Smoke aspiration pipe Connecting the aspiration pipe to the FCS-320 Aspirating Smoke Detector 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
(Terminal X1). Calculate the value of the terminal resistance R follows: 2,7 V − where = Terminal resistance on the reset board [Ohms]U = Line voltage [V]I = Standby current of the line [A] Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
85. Reattach the display board cable to the motherboard and refit the housing cover. Resecure the cover by engaging the quick-release latches. See also – Electrical connection of the reset board, page 85 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
(max. 5 x M20 and 2 x M25). – Fit the cable entry point(s) as required with M20 or M25 connections by pushing them into the cable entries. 2 x M25 and 1 x M20 are supplied in the pack. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 86
Remote indicator for 2nd detector module - Ext. Displ.2 Fault 1 Fault contact for 1st detector module Notice! On Bosch fire panels, use R 820 Ohm for the alarm resistor and RE 2k2 (3k9) for the terminal resistor. 2018.04 | 2.0 | F.01U.130.926 Operation Guide...
Installing the Aspirating Smoke Detector | en 5.6.2 FCS-320-TP1 / FCS-320-TT1 Connection to the Fire Panel Stö 1 5.6.3 FCS-320-TP2 / FCS-320-TT2 Connection to the Fire Panel + L3 Stö 1 Stö 2 DIP switch settings The aspirating smoke detector parameters are set using the DIP switch on the detector modules.
DIAG versions use a COM. For details, please see the diagnostic software documentation. 5.10 Replacing a Detector Module HEA D1 DIAG HEA D2 DIS PLA Y Replacing a detector module Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 90
Reconnect the display board cable to the "DISPLAY" connection on the motherboard. Before initialization, the operating voltage must be connected again. To initialize the pipe system, press the S2 flow-init button on the detector module. – Close the housing cover. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Minimize pipe lengths and changes of direction. Pipe elbows have an extremely high flow resistance. Therefore, they should only be used where they cannot be avoided for structural engineering reasons. If necessary, reduce pipe lengths in proportion to the pipe elbows used. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
For example, a temperature change of 10 °C on a 10 m-long PVC pipe causes a length change of 8 mm. Mounting clamps PVC pipe clips are used as standard for installing the pipe system. These clips do not allow any length extensions. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Air sampling openings Select the structure of the air sampling opening (aspiration boring) and the position in the pipe system according to the project specification and taking into account the planning guidelines. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 94
To keep the adhesive surfaces of the film sheets free of dust and grease, avoid touching them. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Detection at Intake and Exhaust Openings Caution! If the smoke aspiration occurs in a forced airflow (fan, air-conditioning units), direct the air sampling openings depending on the exhaust speed in the airflow. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
For FCS‑320 planning in these applications, see Planning for Forced Airflow, page 69. See also – Planning for Forced Airflow, page 69 – Air-return Pipe, page 98 – Planning for Forced Airflow, page 69 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Filter Change on the Air Filter Box Primary filter B Coarse dust filter C Fine dust filter Changing the filter inserts (in fig.: FAS‑ASD‑FL Filterbox Large) To replace the filter inserts, proceed as follows: Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Insert the air-return pipe through the opened pipe opening in the protective grille and fix it to the FCS-320 with the rubber ring already integrated into the air-exhaust opening. See also – Length Change of the Pipe System, page 92 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
If the blowing-out process has to be repeated (steps 1 to 3), wait at least 120 s. The manual blowing-out process on the pipe system is carried out as follows: Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
When installing, note the correct direction of flow (see arrow on plastic container). Also fasten the water separator with two screws and the clamp. To empty, open the drain valve. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
The test adapter is glued into the pipe system in the direct vicinity of the aspirating smoke detector. During normal operation, the test adapter must always be closed. It is only opened for maintenance and service purposes in order to admit test gas or smoke. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 102
Once the detection system of the aspirating smoke detector and the alarm transfer have been tested, the test adapter must be closed again; otherwise there will be an airflow malfunction! See also – Checking Airflow Monitoring, page 106 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
If changes are necessary at a later time, the airflow sensor must be re-calibrated (see Calibrating the Airflow Sensor, page 104). See also – Conducting the Functional Test, page 108 – Calibrating the Airflow Sensor, page 104 Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
If initialization is not successful, the unit reports a collective fault (fault relay drop off). The precise cause of the abort can be read out using the DIAG Diagnostic Software. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Detach the detector module using test aerosol. Spray the test aerosol either into the first air sampling opening or into the test adapter on the pipe system. – Use the table below to check the transmission line to the fire panel. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Breakage: 3 x flashes Obstruction: 2 x flashes The corresponding flash code is repeated every two seconds. Troubleshooting If the airflow malfunctions are not correctly detected by the unit, proceed as follows: 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Connect the test pipe – Connect the pressure measuring hose to the adapter connection B. – Connect the 4-pin plug of the adapter to the digital pressure gauge and switch it on. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Testing the functionality of the FCS-320 Notice! For the FCS-320-TP2 and FCS-320-TT2, the preparation for the function test (see above) and the following functional test (steps 1–7) are to be carried out for both detector modules and/ or both pipe systems.
Page 109
DIAG Diagnostic Software. A printout of the set values should be placed in the project folder. See also – Preparation, page 103 – Calibrating the Airflow Sensor, page 104 Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Using a multimeter, measure the operating voltage (DC) of the aspirating smoke detector. – The measurement value must be between 14 V and 30 V. Restore the correct power supply. – Display board faulty 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Restore the correct power supply. – Fan connection poles reversed – The fan does not move. – Disconnect the power from the unit. – Disconnect the fan connection cable from the motherboard. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Disconnect the power from the unit. – Reconnect the connection cable for the first detector module to the motherboard. – Restore the operating voltage and run the unit for a few minutes. 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Notice! A hardware defect in the detector module is indicated by a permanently-lit detector module LED. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Only if the selected airflow threshold is exceeded will the airflow malfunction be reported by the device and thus transmitted. Checking the current value 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 115
It is essential that you adhere to the calibration type (air-pressure-dependent or air-pressure- independent) and, if necessary, the values for air pressure, height above sea level, and set voltage in the test log. Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Activation threshold [I/II/III/iV] Save malfunction [yes/no] LOGIC SENS [yes/no] Air-pressure-dependent calibration [yes/no] Air-pressure-independent calibration [yes/ Height [m above sea level] Air pressure [hPa] Temperature [°C] Obstruction malfunction LED flashing +/- Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...
Page 128
Signal transmission to fire panel +/- LED saved +/- Relay saved +/- Main alarm LED flashing +/- Relay activates after delay +/- Signal transmission to fire panel +/- LED saved +/- Relay saved +/- 2018.04 | 2.0 | F.01U.130.926 Operation Guide Bosch Sicherheitssysteme GmbH...
Page 129
Aspirating Smoke Detector Appendix | en 129 Legend: + in order / - not in order Date: ..... Place: ........Issuer: ......... Signature:....... Bosch Sicherheitssysteme GmbH Operation Guide 2018.04 | 2.0 | F.01U.130.926...