Installation Procedure - YASKAWA SI-P3/V Installation Manual

Ac drive 1000-series option, profibus-dp
Hide thumbs Also See for SI-P3/V:
Table of Contents

Advertisement

5

Installation Procedure

Section Safety
Do not connect or disconnect wiring while the power is on.
Failure to comply will result in death or serious injury.
Disconnect all power to the drive, wait at least five minutes after all indicators are off,
measure the DC bus voltage to confirm safe level, and check for unsafe voltages before
servicing to prevent electric shock. The internal capacitor remains charged even after the
power supply is turned off. The charge indicator LED will extinguish when the DC bus
voltage is below 50 Vdc.
Do not remove option board cover while the power is on.
Failure to comply could result in death or serious injury.
The diagrams in this section may include option units and drives without covers or safety
shields to show details. Be sure to reinstall covers or shields before operating any devices.
The option board should be used according to the instructions described in this manual.
Do not allow unqualified personnel to use equipment.
Failure to comply could result in death or serious injury.
Maintenance, inspection, and replacement of parts must be performed only by authorized
personnel familiar with installation, adjustment, and maintenance of this product.
Do not use damaged wires, place excessive stress on wiring, or damage the wire
insulation.
Failure to comply could result in death or serious injury.
YASKAWA ELECTRIC TOBP C730600 23C 1000-Series Option SI-P3/V, SI-P3/T Installation Manual
DANGER
Electrical Shock Hazard
W ARNING
Electrical Shock Hazard
5 Installation Procedure
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Si-p3/tProfibus-dp 1000 series

Table of Contents