Power flow

The following phasor diagram illustrates the relationship between the
supply voltage and the Regen drive voltage. The angle between the two
voltage vectors is approximately 5° at full load, this results in a near unity
power factor of 0.996.
Figure 2-1
ω
J LI
V
s
VAC
Supply
ω
j LI
r
V s
V r
I
r
Power flow
from supply
V
Supply voltage
s
V
Voltage at line terminals of Regen drive
r
ω
j LI
Voltage across Regen inductor
r
I
Current at line terminals of Regen drive
r
The direction of the power flow can be changed relative to the supply
voltage, by making small changes to the Regen drives output voltage
and phase.
2.5

Synchronisation

The synchronisation of the Regen drive to the supply does not require
additional hardware. The space vector modulator within the Regen drive
represents the angle and magnitude of the AC supply at all times. This
however is not the case when the AC supply is first connected or when
the Regen drive is disabled.
Unless some form of synchronisation is carried out the current
controllers will start with values of zero resulting in zero volts being
applied to the inverter output terminals. The phase locked loop (PLL)
would also start with zero and so would not lock onto the supply.
To overcome these problems the following information must be obtained
before the Regen drive attempts to start:
1. The mains supply voltage vector magnitude
2. The angle of the supply voltage vector
3. The frequency of the supply
These values are obtained by carrying out a synchronisation on enable
The first stage of the pre-start tests is to measure the initial DC Bus
voltage, which is assumed to be equal to the peak line-to-line
voltage of the supply.
The second stage of the pre-start test is to apply two short pulses of
zero volts at the converter input. These pulses must be short enough
so that the peak current is less than the over current trip level of the
converter. The time between the pulses must also be long enough
so that the current built up in the input inductors during the first pulse
has decayed to a low level before the second pulse is applied.
These are used to calculate the instantaneous angle of the supply
voltage vector during the first test pulse. The second test pulse is
8
System
Mechanical
design
installation
AC
r
V
r
U
+DC
V
-DC
W
I
r
DC
ω
j LI
r
V r
V s
Power flow
back to supply
I
r
www.controltechniques.com
Electrical
Getting
Optimisation
installation
started
then applied at time Td later to allow the supply frequency to be
calculated.
At this stage the supply inductance is also calculated
Once the synchronization is complete the phase locked loop (PLL) is
set-up. At this point the whole control system could be started and
should operate without any large transients.
To improve the robustness of the start-up phase a further short test
pulse voltage vector, with the same magnitude and phase as the
estimated supply voltage vector is applied. This is to detect
measurement errors that could have occurred because of supply
distortion present during the pre-start tests.
2.6

Current trimming

A current feedback trimming routine runs before the drive is enabled to
minimise offsets in the current feedback. This feature can be user
configured, for more details refer to section 8.5 Current trimming on
page 91.
2.7

Regen system configurations

The Regen drive has been designed to provide a regulated DC supply to
other motoring drives. The Regen drive gives bi-directional power flow
with sinusoidal currents and a near unity power factor.
Following are the possible configurations for Unidrive SP Regen:
Single Regen, single or multiple motoring (Figure 4-1 on page 32)
Single Regen, multiple motoring using a Unidrive SPMC (Figure 4-
2 on page 34)
Single Regen, multiple motoring using an external charging resistor
(Figure 4-3 on page 36)
Multiple Regen, multiple motoring using a Unidrive SPMC (Figure 4-
4 on page 38)
Refer to Table 3-2 on page 14, for the Regen drive ratings.
The sizing of a regen system must take into account the following
factors:
Line voltage
Motor rated current, rated voltage and power factor
Maximum load power and overload conditions
In general, when designing a regen system, equal Regen and motoring
drive rated currents will work correctly. However, care must be taken to
ensure that under worst case supply conditions the Regen drive is able
to supply or absorb all the required power. In multi-drive configurations,
the Regen drive must be of a sufficient size to supply the net peak power
demanded by the combined load of all the motoring drives and total
system losses.
If the Regen drive is unable to supply the full power required by the
motoring drive, the DC bus voltage will drop and in severe cases may
lose synchronisation with the mains and trip. If the Regen drive is unable
to regenerate the full power from the motoring drive on the DC bus, then
the Regen and motoring drive(s) will trip on over-voltage.
Technical
Component
Parameters
data
sizing
Unidrive SP Regen Installation Guide
Issue Number: 2
Diagnostics

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents