Pre-Installation Test; Procedure - Siemens 7MF4333 User Manual

Sitrans p, series dsiii transmitters for pressure, differential pressure, flanged level, and absolute pressure
Hide thumbs Also See for 7MF4333:
Table of Contents

Advertisement

UMSITRPDS3-1

3.0 PRE-INSTALLATION TEST

Prior to installation, the transmitter can be tested and operated from the HART Communicator. This test
consists of checking that the transmitter is operational and that all configuration information is correct.
Section 5 Post-Installation Test provides an on-line test procedure. For an in-depth discussion of
transmitter configuration, refer to Section 6 On-Line Configuration and Operation.
Transmitter orientation will affect the analog output zero. Refer to Section 7.1
Calibration for details.

3.1 PROCEDURE

A complete transmitter functional test can be performed and configuration procedures can be practiced.
To operate the transmitter on a test bench, make the connections shown in Figure 3-1. Figure 3-2 shows
the connections if these tests are to be performed after transmitter installation. A pressure source can also
be connected.
1 Transmitter field terminals
2 Analog output test terminals
3 Digital milliammeter
4 DC power supply
5 HART Communicator
Note: If using a Model 375 Field Communicator, see the inside of the front cover of this
manual.
November 2010
IMPORTANT
3
_
mA
+
+
Vdc
_
4
5
Notes:
1.
Loop current can be shown on the optional transmitter
display in 0-100%.
2.
Alternatively, the milliammeter can be connected to the
transmitter's analog output test terminals and the power
supply positive (+) terminal connected to the transmitter's
positive (+) terminal.
FIGURE 3-1 Bench Test Connections
250
I
O
2
Pre-Installation Test
1
_
+
-
+
4-20 mA
3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7mf40337mf42337mf44337mf45337mf46337mf4812

Table of Contents