Ips Check (Only For Italy Cei0-21 Grid Code) - Huawei SUN2000L User Manual

Single-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000L:
Table of Contents

Advertisement

SUN2000L-(2KTL-5KTL)
User Manual
Figure 7-28 Feed Power into Grid
Table 7-6 Description Feed Power into Grid
Parameter
charge/discharge power
----End

7.4.3.4 IPS Check (Only for Italy CEI0-21 Grid Code)

Context
The Italy CEI0-21 grid code requires IPS check for the SUN2000L. During the self-check
process, the SUN2000L consecutively checks the protection thresholds and time for 10-min
overvoltage, level 1 overvoltage, level 1 undervoltage, level 1 overfrequency, and level 1
underfrequency. The SUN2000L shuts down after the check starts, and it restarts after the
check is successful.
Procedure
Step 1 On the Operation console screen, choose Device maintenance > IPS check to access the
IPS check screen.
Issue 02 (2017-12-12)
Description
The power grid will charge
the battery if Feed Power
into Grid is enabled.
Feed Power into Grid is set
to Disable by default. If this
function is enabled, comply
with the grid charge
requirements stipulated in
local laws and regulations.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Operations on the Local FusionHome App
Value Range
Disable
Enable
81

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents