Huawei SUN2000L User Manual page 60

Single-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000L:
Table of Contents

Advertisement

SUN2000L-(2KTL-5KTL)
User Manual
No.
8
Procedure
Step 1 Connect signal cables to appropriate signal connectors.
Figure 5-19 Assembling a signal connector (COM port)
Issue 02 (2017-12-12)
Label
Definition
PE
Shielding ground
The protection layer of the cable is in the connector. Surplus core wires are cut off from
the protection layer.
Ensure that the exposed core wire is totally inserted into the cable hole.
Ensure that the signal cables are connected securely.
Ensure that the cable is not twisted.
If a connector needs to connect to only one signal cable, block the unused cable hole on
the seal using a cap and tighten the cable gland.
If a connector needs to connect to two signal cables, ensure that the cables have the same
outer diameter.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
Description
Connects to the shield layer
of the cable.
53

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents