Installing The Pe Cable - Huawei SUN2000L User Manual

Single-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000L:
Table of Contents

Advertisement

SUN2000L-(2KTL-5KTL)
User Manual

5.2 Installing the PE Cable

Context
Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks will
be caused.
Procedure
Step 1 Crimp the OT terminal.
Figure 5-3 Crimping an OT terminal
(A) Core wire
Issue 02 (2017-12-12)
Pay attention not to damage the core wire when stripping a cable.
The cavity formed after the conductor crimp strip of the OT terminal is crimped must wrap
the core wires completely. The core wires must contact the OT terminal closely.
Wrap the wire crimping area with heat shrink tubing or PVC insulation tape. The
following figure uses heat shrink tubing as an example.
When using the heat gun, protect devices from being scorched.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(B) Insulation layer
5 Electrical Connections
(C) Heat shrink tubing
38

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents