Huawei SUN2000L User Manual page 54

Single-phase grid-tied pv string inverter
Hide thumbs Also See for SUN2000L:
Table of Contents

Advertisement

SUN2000L-(2KTL-5KTL)
User Manual
Ensure that the core wires can be seen through the hole on the terminal both before and after
the positive and negative metal terminals are crimped.
Figure 5-13 Observing core wires through the hole on the terminal
Step 2 Ensure that the DC input voltage of each PV string is within the specified range of the
SUN2000L using a multimeter and check that the polarities of DC input power cables are
correct.
Figure 5-14 Measuring the DC input voltage
Before performing
Issue 02 (2017-12-12)
Step
3, ensure that the DC switch is OFF.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
47

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents