Getting Started; Unpacking - Agilent Technologies 4200 FlexScan Operation Manual

Ftir
Hide thumbs Also See for 4200 FlexScan:
Table of Contents

Advertisement

Unpacking

To unpack your spectrometer system:
1
Agilent 4200 FlexScan FTIR Operation Manual

2. Getting Started

Unpacking
Components
Installing the battery 12
Power switch LED status 13
Starting the software 14
Performance verification 16
After receiving the Agilent 4200 FlexScan FTIR delivery, do not
immediately open the shipping container. Instead, place the
shipping case in a room-temperature environment and allow
several hours for the contents of the container to reach the room
ambient temperature. This is to avoid unnecessary condensation
on the components prior to the initial setup and installation
process.
Your 4200 FlexScan FTIR has been packed to ensure that it
arrives at your facility ready to go to work. Custom foam inserts
protect the instrument from damage during travel. Whenever
your instrument is shipped via common carrier, it needs to be re-
packed in the shipping case. Using this case, your 4200 FlexScan
can be removed and re-packed in the case in a matter of seconds,
while maintaining instrument security.
9
11
Getting Started
9

Advertisement

Table of Contents
loading

Table of Contents