Leica GS15 User Manual page 36

Viva series rtk gnss smart antenna / receiver
Hide thumbs Also See for GS15:
Table of Contents

Advertisement

Equipment setup
step-by-step
GS10/GS15, Operation
Step
Description
1.
Attach the GHT62 for CS15 or the GHT66 for CS20 holder to the pole.
2.
Insert the data storage device and the battery into the field controller.
3.
Clip the field controller into the holder and lock it by pushing the locking pin
into the locked position.
4.
Press ON/OFF button on the field controller to switch on.
Proceed with step 5. for GS10 and with step 24. for GS15.
5.
Screw the GNSS antenna to the top of the pole.
6.
Insert the data storage device and the batteries into the instrument.
7.
GS10
Attach the radio in its housing to port P2 or P3 on the instrument.
GS25
Insert the slot-in radio into port P3 on the instrument.
8.
Place the instrument in the backpack with the top side facing outwards and
the instrument front panel to the top.
9.
Fasten the strap around the instrument.
10.
Push the telescopic rod through the slit in the top of the backpack. Ensure
that it is located in the sleeve inside the backpack and push it all the way to
the bottom.
11.
Adjust the height of the telescopic rod to suit.
12.
Screw the radio antenna arm onto the telescopic rod.
13.
Connect the first 1.2 m antenna cable to the radio antenna.
14.
Pass the cable through the opening in the top of the backpack and down
underneath the instrument.
15.
Connect the first 1.2 m antenna cable to the radio.
16.
Connect the 1.6 m antenna cable to port ANT on the instrument.
17.
Pass the 1.6 m antenna cable through a cable brake and down through the
opening in the bottom corner of the backpack flap.
18.
Draw the required amount of cable out of the backpack and tighten the
cable brake.
19.
Connect one end of the second 1.2 m antenna cable to the loose end of the
1.6 m antenna cable and the other end to the GNSS antenna.
20.
Connect the 1.8 m, CS to GS cable to the field controller.
21.
Pass the 1.8 m, CS to GS cable through the opening in the bottom corner of
the backpack flap and up through a cable brake.
22.
Plug it into port P1 on the instrument.
23.
Press ON/OFF button on the instrument to switch on.
GS15
24.
Insert the data storage device and the batteries into the GS15.
25.
Press ON/OFF button on the GS15 to switch on.
26.
Screw the GS15 to the top of the pole.
27.
The field controller and GS15 are connected via Bluetooth.
36

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs10

Table of Contents