4.
MAINTENANCE
Watch out for mains voltage when handling electric
cables!
In planning product maintenance machine utilization
degree and circumstances should be considered.
Careful use and preventive maintenance help to avoid
unnecessary production disturbances and breaks.
4.1 Daily maintenance
The following maintenance opeations should be carried
out daily:
• Check water level and input flow, add liquid if
needed.
• Check cables and connections. Tighten, if
necessary and replace defect parts.
• Check that there are no leakages in the cooling
water hoses.
4.2 Monthly maintenance
Check and clean the filter unit on the front panel once a
month:
1.
Unscrew the cup from the filter and remove the
filter from the pivot.
2.
Clean the filter net using water and compressed
air.
3.
Replace the filter net and the cup.
© Kemppi Oy 2016
4.3 Every sixth months
The following maintenance opeations should be carried
out at least every sixth months:
• Clean off dust and dirt. Change the cooling
• Check seals, cables and connections. Tighten, if
9
A7 Cooler
liquid and wash up the pipes and water reservoir
with pure water.
necessary and replace defect parts.
1636