Fujitsu AUYG07LVLA Design & Technical Manual page 422

Multi: 5, 6 rooms type
Hide thumbs Also See for AUYG07LVLA:
Table of Contents

Advertisement

7. Disconnect the power supply or turn off the breaker.
NOTE: If the pump down is not stopped by pressing the switch as in step 6, it will stop au-
tomatically after 15 minutes and the LED will light as follows. If the pump down is
complete, disconnect the power supply or turn off the breaker. If not completed
open the liquid pipe valve, and then start again from step 3.
• In order to interrupt the pump down operation, press the [PUMP DOWN] switch again. The
LED will return to the original display before starting pump down.
(POWER/MODE LED: On)
• The pump down may stop before completion due to error. To complete the pump down,
correct the error, open the liquid pipe valve and then start from step 1 again.
Otherwise, the refrigerant can be recovered from the service port.
POWER
ERROR
MONITOR
MODE
A
B
C
(3-blink)
blink
(High-speed)
- 414 -
D
E
F

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents