Lutron Electronics QSGRK-6D Quick Installation And Operation Manual page 12

Grafik eye qs with dali
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
DALI Setup Overview
After DALI devices are wired and powered, they must be reset and addressed so the
system can control them. The "Build System" command automates this process, as
shown below.
Note: All existing DALI programming will be deleted when the "Build System"
command is run.
Build System
1. Enter programming mode (see page 9).
Main menu
2. Use the Master buttons to highlight "DALI" and press the
Zone setup
OK button to accept.
DALI
3. Use the Master buttons to highlight "Build system" and press
the OK button to accept.
4. Press the OK button to erase all current programming, reset
DALI
and address DALI devices, and find sensors on the system.
5. Exit programming mode (see page 9).
Build system
Assign zones
Note: After running "Build System", Zone 4 will control all DALI
devices for diagnostics and verification of wiring. (This feature
is disabled once any of the addressed devices are assigned
Build system
to a zone on the GRAFIK Eye QS.) Use the Zone 4 raise/lower
buttons to verify that all devices are correctly addressed. If a
Erase digital load
device does not respond, repeat the "Build System" command
Programming?
and/or check the wiring.
Searching...
x
Found
x Loads
Found
®
1
9
2
10
3
11
4
12
For additional information, see the complete installation and operation guide at www.lutron.com/qs
GRAFIK Eye
5
13
6
14
7
15
8
16
9-16
1-8
1
9
2
10
QS with DALI Quick Installation and Operation Guide 12
®
Master
buttons
OK
OK
button
Timeclock
(back) button
3
11
4
12
5
13
6
14
7
15
8
Use Zone 4
raise/lower
buttons
to verify
all DALI
devices
have been
addressed.
16
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents