General; Freight Damage Claims Procedure; Technical Specifications; Cube Size: 5/8"W X 7/8"H X 7/8"D - Cornelius XAC 1444 Service Training Manual

Xtreme ice xac series; xwc series; xrc series;
Hide thumbs Also See for XAC 1444:
Table of Contents

Advertisement

Xtreme Ice Training Manual

FREIGHT DAMAGE CLAIMS PROCEDURE

The deliverer of your equipment (freight company, distributor or dealer) is responsible for loss or damage
of your shipment. All claims must be filed with the deliverer of your equipment. Please follow the steps
below to determine if your shipment is satisfactory or if a claim must be filed:
1. Check the number of products delivered against the number of products listed on the delivery re-
ceipt. Should the totals not match, have the driver note all errors on both copies and both you and
the driver sign and date said notation.
2. Inspect all cartons for visible damage. Open and inspect as required before the driver leaves and
have him or her note any damage on the receipts. All damaged claims must be inspected within 15
days of delivery. Notify your carrier immediately if concealed damage is found after delivery.
3. Should concealed damage be found when product is unpacked, retain the packing material and the
product and request an inspection from the deliverer.
4. All claims for loss or damage should be filed at once. Delays in filing will reduce the chance of
achieving a satisfactory resolution to the claim.

TECHNICAL SPECIFICATIONS

Cube Size: 5/8"W X 7/8"H X 7/8"D

Ambient Temperature: 50_F/10_C – 100_F/38_C
Water Temperature: 50_F/10_C – 90_F/32_C
Water Pressure: 20–80 psi

Maximum Fuse Size: See Nameplate

Circuit Amp.: See Nameplate

Refrigerant Type: R–404a

Refrigerant Charge: See Nameplate

October 17, 2005

GENERAL

5
TP00952

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents