Installing The Fbwc Module And Capacitor Pack (B120I) - HP ProLiant ML350e Gen8 User Manual

Hide thumbs Also See for ProLiant ML350e Gen8:
Table of Contents

Advertisement

Install the capacitor pack:
9.
For an integrated power supply
o
For a redundant power supply
o
Install the PCI air baffle
10.
Install the access panel (on page 25).
11.
Return the server to an upright position.
12.
Lock the front bezel (on page 23).
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server (on page 22).
16.

Installing the FBWC module and capacitor pack (B120i)

To install the component:
Power down the server (on page 22).
1.
("PCI air baffle
option" on page 37).
Hardware options installation 58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents