Analysis Sequence
7. The system begins to evacuate the manifold at a rate and time specified in the sample file.
8. All valves close, then the N2 valve opens and the Po tube is filled to the target pressure.
9. The manifold is evacuated and helium is purged from the gas line.
3-4
TriStar II 3020 Service
Jul 09
Need help?
Do you have a question about the TriStar II 3020 and is the answer not in the manual?
Questions and answers