JLG 800A Operation And Safety Manual page 146

800 series articulating boom lifts
Table of Contents

Advertisement

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3. The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
Table 6-20. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
70 ft. lbs.
(95 Nm)
4. Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
6-32
2nd Stage
3rd Stage
170 ft. lbs.
300 ft. lbs.
(225 Nm)
(405 Nm)
6.5
DRAINING OIL BUILD UP FROM THE PROPANE
REGULATOR (PRIOR TO S/N 0300134626)
During the course of normal operation oils may build inside the
primary and secondary chambers of the propane pressure regu-
lator. These oils may be a result of poor fuel quality, contamina-
tion of the fuel supply chain, or regional variation in the make up
of the fuel. If the build up of the oil is significant this can effect the
operation of the fuel control system. Refer to Section 6.3, Opera-
tor Maintenance for maintenance intervals. More frequent drain-
ing may be required if the fuel supply has been contaminated.
FOR BEST RESULTS WARM THE ENGINE TO OPERATING TEMPERATURE BEFORE
DRAINING. THIS WILL ALLOW THE OILS TO FLOW FREELY FROM THE REGULATOR.
1. Move the equipment to a well ventilated area. Ensure there
are no external ignition sources.
2. Start the engine and bring to operating temperature.
3. With the engine running, close the manual tank valve and
run the engine out of fuel.
– JLG Lift –
3121209

Advertisement

Table of Contents
loading

This manual is also suitable for:

800aj

Table of Contents