Post-Installation Test
8. Close the active pressure valve (2).
9. Open the active pressure valve (3B) slightly until air-free liquid emerges, then close it.
10. Close the vent valve at the low-pressure chamber (1).
11. Open the active pressure valve (3A) by 1/2 turn.
12. Check and correct zero (4 mA) if necessary at zero bar.
13. Close the compensation valve (2).
14. Open the active pressure valves (3A and 3B) fully.
Transmitter above the active pressure taps (normal
arrangement)
1
Transmitter
2
Compensation valve
3
Active pressure valves
4
Active pressure lines
5-10
Transmitter below the active pressure taps
(exception)
5
7
10
12
FIGURE 5-5 Measuring Liquids
Shutoff valves
Blowout valves
Active pressure taps
Gas collectors (optional)
UMSITRPDS3-1
November 2005