With A Loaded Configuration In The C7 Op - Siemens SIMATIC C7-626 Installation, Assembly, Wiring

Table of Contents

Advertisement

2.11.1

With a Loaded Configuration in the C7 OP

Starting Up
After applying the power supply the C7 carries out a self-test. The test checks
the functionality of the most important device components and displays the
results of the test via the LED status and the display screen. The following
startup will be carried out:
1. The C7 carries out a self test after power on.
2. The C7 carries out an operating system test for both parts (C7 CPU and
3. During the start-up phase (1 and 2) the C7 CPU remains in STOP mode.
4. Confirm the displayed message by pressing
C7-626 / C7-626 DP Control Systems
C79000-G7076-C626-01
C7 OP).
Once the C7 OP has been started up, the following basic screen will be
displayed:
!
399 Startup complete
Basic C7-626 picture
1
2
Figure 2-13 Basic C7 Picture (Example)
Installing and Preparing the C7
3
4
5
.
2
Softkey
icons for
selecting
standard
pictures
2-25