Mira Excel Installation & User Manual page 25

Shower control
Hide thumbs Also See for Excel:
Table of Contents

Advertisement

3.13 Loosely attach the compression nuts
and olives.
3.14 Fit the support bracket and valve unit
in to the wall with the two fixing screws.
3.15 Insert the hot and cold supply and top
outlet pipes through the compression
nuts and olives. Ensure that each
pipe is pushed fully into the valve.
Note! For falling inlet supplies the
outlet pipe may have to be set deeper
into the wall.
3.16 Hold each pipe in position and use a
suitable spanner to tighten the
compression nuts.
3.17 Turn on the water supplies and check
for any leaks.
3.18 Refit the three building-in shroud
sections that you removed earlier.
Secure the shroud in position with the
screws.
3.19 Plaster and tile as necessary up to the
sides of the building-in shroud.
Make sure that the finished tiled wall
surface is within the FINISH arrow on
the building-in shroud.
Compression Nut
Compression Nut
Separate these two parts
25
Olive Threads

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents