Customer-provided items for the NetBackup 5330
system installation
Customer-provided items for the NetBackup 5330 system installation
NetBackup 5330 system container contents
Table 2-1
Container
Contents
5330 appliance
■
■
■
■
■
■
Primary Storage
■
Shelf
■
■
■
■
■
Expansion Storage
■
Shelf
■
■
■
■
The following describes the necessary personnel and equipment that are needed
at the installation site:
At least two people or a mechanical lift to move the storage shelves.
■
A keyboard and a monitor to connect to the appliance.
■
Ethernet and Fiber Channel (FC) cables to connect the appliance to your
■
corporate network.
A 19-inch rack with dual Power Distribution Units (PDUs).
■
220VAC power supply for the Primary Storage Shelf and the Expansion
■
Storage Shelf
Safety manual
Left and right rack rails
Appliance
Appliance bezel
Two power cords
Shrink-wrapped, yellow, portfolio containing the following:
USB sticks with factory reset files.
■
NetBackup 5330 Appliance Hardware Installation Guide
■
NetBackup 5330 Appliance Initial Configuration Guide
■
Warranty and license information
■
Left and right rack rails with mounting hardware
Shelf bezel
Primary Storage Shelf
Four Fiber Channel cables
Four SFPs
Two power cords
Left and right rack rails with mounting hardware
Shelf bezel
Expansion Storage Shelf
Two power cords
Four SAS cables
Hardware pre-installation requirements
20
Need help?
Do you have a question about the NetBackup 5330 and is the answer not in the manual?