Norac UC5 Installation Manual

Norac UC5 Installation Manual

Spray height controller. john deere active roll (4720, 4710, 4700)
Hide thumbs Also See for UC5:

Advertisement

Spray Height Controller
John Deere Active Roll
(4720, 4710, 4700)
Installation Manual
JD07A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Norac UC5

  • Page 1 Spray Height Controller John Deere Active Roll (4720, 4710, 4700) Installation Manual JD07A...
  • Page 2 Reorder P/N: UC5-BC-JD07A-INST Rev G (JD Active Roll 4720, 4710, 4700) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
  • Page 3: Table Of Contents

    Contents Introduction .....................1 General UC5 System Layout .................2 Kit Parts ......................3 Pre-Install Checklist ..................9 Ultrasonic Sensor Installation ..............10 Target Installation and Alignment............. 15 Module Installation ..................18 Connecting the Sensors to the CANbus ........... 22 Hydraulic Installation .................. 23 Software Setup ....................
  • Page 4: Introduction

    INTRODUCTION Congratulations on your purchase of the NORAC UC5 Spray Height Controller. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
  • Page 5: General Uc5 System Layout

    GENERAL UC5 SYSTEM LAYOUT Figure 1 illustrates the general layout of the UC5 system components: Figure 1: General UC5 System Layout...
  • Page 6: Kit Parts

    KIT PARTS Kit Overview Figure 2: JD07A System Parts...
  • Page 7 Hydraulic Plumbing Figure 3: JD07A Hydraulic Plumbing...
  • Page 8 CABLE UC5 NETWORK 18 AWG 3M 43210-01 CABLE UC5 NETWORK 18 AWG 1M 43210-20 CABLE UC5 NETWORK 18 AWG 20M 43230-04 CABLE UC5 VALVE 2PIN DT TO 2PIN DT 43240-06 CABLE UC5 INTERFACE TILT JD 43240-05 CABLE UC5 INTERFACE MAIN JD 43250-07...
  • Page 9 105480 HYD CYLINDER ROLL BIAS 1.75IN BORE X 7.125IN STROKE REV A 44864-03 HOSE ASSEMBLY 122R2-08 166 IN L 6FORX 6FORX UC5-BC-JD07A-INST MANUAL INSTALLATION UC5 JD ACTIVE ROLL (4720, 4710, 4700) 106034 UC5 NETWORK 2 PIN PLUG 106035 UC5 NETWORK 12 PIN PLUG (A-KEY)
  • Page 10 Hydraulic Fitting Kit Details (P/N: 44865-36) Item Part Number Name Quantity Picture 104691 TEE ADAPTER - 4FORXR 4MORT 104586 TEE ADAPTER - 6FORXR 6MORT 105226 MALE TO FEMALE ADAPTER - 4MOR 6FORX 44917 MALE ADAPTER - 6MB-6MOR MACHINED ORB 104693 MALE ADAPTER - 4MOR 4MB Fitting Name 6 M B - 6 M OR X 90...
  • Page 11 ORIFICE INSERT .042 IN ONE WAY These fittings are only used when installing the active roll option. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
  • Page 12: Pre-Install Checklist

    PRE-INSTALL CHECKLIST The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
  • Page 13: Ultrasonic Sensor Installation

    ULTRASONIC SENSOR INSTALLATION Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instructions below. Figure 5: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
  • Page 14 Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each UC5 sensor has a serial number stamped on the sensor housing.
  • Page 15 Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
  • Page 16 If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 4. Mount the NORAC UC5 ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
  • Page 17 Main Lift Sensor Installation Figure 10: Main Lift Bracket Assembly 1. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom.
  • Page 18: Target Installation And Alignment

    TARGET INSTALLATION AND ALIGNMENT NOTE: It is very important that the rods be installed on the right hand side of the sprayer. 1. Ensure the sprayer chassis and booms are leveled and the center section is approximately 4 feet above the ground. A ladder or step will be required for this part of the installation. Sensor Bracket Roll...
  • Page 19 2. Remove the rubber bumpers on both ends of the roll frame (Figure 12). 3. Assemble the roll sensor mounting bracket as shown in Figure 14. Figure 14: Roll Sensor Mounting Bracket 4. Install the roll sensor bracket on the T-shaped black intermediate frame (Figure 12). The sensor should be mounted between the parallel lift arms and the wheel in a position that will not interfere with folding.
  • Page 20 7. Adjust the targets and sensor bracket using a level or a plumb line. Ensure the sprayer is level and the booms are level when installing the roll targets. The spring target must be aligned on the centerline of the sensor. The Frame target must be aligned ½" to the left side of the centerline.
  • Page 21: Module Installation

    MODULE INSTALLATION Control Module 1. Refer to Figure 1 and Figure 18. 2. Securely mount the control module (E01) inside the sprayer cab, using the included brackets, screws or cable ties. 3. Connect the display terminal to the control module using the display cable. This cable must be connected to the end of the control module with only one Deutsch connector.
  • Page 22 Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards the P and T ports with the label facing up. Output Number Normal Function Left Up Left Down...
  • Page 23 Figure 21: Valve Module Bracket Installation 5. Connect the valve module CANbus to cable C01 from the control module. Route cable C02 from the other CANbus connector to the 6 way coupler. 6. With the valve module securely mounted to the valve block, connect the valve cables (C10), to the valve coils.
  • Page 24 Input Module 1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the boom using the included brackets or cable ties. 2. Connect the free end of the CANbus cable (C02) from the valve module to the input module.
  • Page 25: Connecting The Sensors To The Canbus

    Follow existing cables and hoses to be sure the cable will not be pinched or stretched. Figure 24: UC5 Module Locations and Cable Connections 5. At the sensor brackets, attach a 2-way coupler with terminator (E20) to the sprayer boom.
  • Page 26: Hydraulic Installation

    Component failure due to oil contamination is not covered under the NORAC UC5 system warranty. It is recommended that a qualified technician perform the hydraulic installation.
  • Page 27 Valve Block Mounting 1. A good mounting location for the valve block on the John Deere is illustrated in Figure 26. 2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes are 3/8”...
  • Page 28 Roll Cylinder Installation 1. Remove the link arm (black square tube) connected between the parallel lift frame and roll frame. See Figure 27 for the link arm location. Link Position Figure 27: John Deere Link Arm Location (looking towards rear of sprayer) 2.
  • Page 29 3. In some cases, the bracket has failed at the weld shown in Figure 29. It is recommended that all sprayers with roll control add weld to the existing bracket to prevent failure. Some sprayers from 2005 and newer already have gussets added at the factory. Figure 29: Roll Cylinder Mount Weld Locations 4.
  • Page 30 2. Attach the 6FORXR-6MORT (F10) fitting to the pressure and tank ports on the NORAC valve block (V01). 3. Connect hose H78 to fitting F10 on the tank port of the NORAC valve and H71 to fitting F10 on the pressure port.
  • Page 31 Figure 31: Secondary Pressure Line Connection 7. Route the secondary tank line (H78) to the inlet on the sprayer’s hydraulic in-line filter. Tee hose H78 into the in-line filter using a 6FORXR-6MORT tee fitting (F10) (Figure 32).
  • Page 32 Illustration A shows the original plumbing of the load sense return and orifice. B and C show two options for the installation of the tee fitting. Figure 33: Secondary Tank Line Install (Load Sense = LS, NORAC Secondary Tank Line = TL)
  • Page 33 12. The “lower” lines must be connected to the "A" ports of the NORAC valve block. 13. Install hoses H72 to the roll cylinder that was previously installed. Route the hoses to the NORAC valve block. Connect the hose attached to the rod end of the cylinder to the “B” port of the 3 station of the block.
  • Page 34 Rear of Sprayer Figure 34: Looking towards the rear of the sprayer on a JD4700, JD4710...
  • Page 35 Rear of Sprayer Front view of block Figure 35: Load Sense Plumbing on some JD4710...
  • Page 36 Rear of Sprayer Figure 36: Load Sense Line Connection to John Deere Combination Valve Block...
  • Page 37 Figure 37: 2003+ Load Sense Line Connection...
  • Page 38: Software Setup

    3. Turn on the power for the display terminal using the switch on the side. 4. The procedure for the installation of the UC5 Spray Height Control system is now complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5...
  • Page 39: System Maintenance

    11 SYSTEM MAINTENANCE For good performance in corners, when driving over terraces or through ditches at an angle, or in hard steer situations it is important to do the following: 1. The Teflon sliding pads on the boom must not grab in dynamic situations (corners, terraces etc).
  • Page 40 Figure 39: Upper Front Sliding Pad Figure 40: Lower Front and Rear Sliding Pads...
  • Page 41: Cable Drawings

    12 CABLE DRAWINGS 12.1 ITEM C01: 43220-10 - CABLE UC5 NETWORK 14 AWG - 10M 12.2 ITEM C02: 43220-01 - CABLE UC5 NETWORK 14 AWG - 1M...
  • Page 42 12.3 ITEM C03: 43210-03 - CABLE UC5 NETWORK 18 AWG - 3M 12.4 ITEM C04: 43210-01 - CABLE UC5 NETWORK 18 AWG - 1M...
  • Page 43 12.5 ITEM C05: 43210-20 - CABLE UC5 NETWORK 18 AWG - 20M 12.6 ITEM C10: 43230-04 – CABLE UC5 VALVE DT TO DT...
  • Page 44 12.7 ITEM C20: 43240-06 – CABLE UC5 INTERFACE TILT JD...
  • Page 45 12.8 ITEM C21: 43240-05 – CABLE UC5 INTERFACE MAIN JD...
  • Page 46 ITEM C30: 43250-07 – CABLE UC5 BATTERY JD 12.9...
  • Page 47 Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States NORAC, Inc. Phone: (+1) 952 224 4142 Toll Free: 1 866 306 6722...

Table of Contents