Spray height control system.
enhanced stability option (11 pages)
Summary of Contents for Norac UC5
Page 1
John Deere (4730 & 4830) with Proportional Main Lift Installation Manual JD08...
Page 2
Reorder P/N: UC5-BC-JD08-INST Rev O (John Deere 4730 & 4830 with Prop ML) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
HOSE ASSEMBLY 122R2-06 104 IN L 6FORX 6FORX 44865-36 HYDRAULICS FITTING KIT - JD8 44865-37 HYDRAULICS FITTING KIT - JD9 UC5-BC-JD08-INST MANUAL INSTALLATION UC5 JOHN DEERE (4730 & 4830) WITH PROP ML 106034 UC5 NETWORK 2 PIN PLUG 106602 UC5 NETWORK 12 PIN PLUG (A-KEY) 105882...
Page 10
Hydraulic Fitting Kit Details (P/N: 44865-36) Picture Item Part Number Name Quantity 104691 TEE ADAPTER - 4FORXR 4MORT 104586 TEE ADAPTER - 6FORXR 6MORT 105226 MALE TO FEMALE ADAPTER - 4MOR 6FORX 44917 MALE ADAPTER - 6MB-6MOR MACHINED ORB 104693 MALE ADAPTER - 4MOR 4MB 105500 SETSCREW 1/4X3/8...
Page 11
P - PIPE Do not use high speed power tools/drills when installing hardware. The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation.
Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each UC5 sensor has a serial number stamped on the sensor housing.
Page 14
Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground. 2.
Page 15
Low Profile Bracket Mounting Guidelines 1. Minimize the distance between the bolts to prevent bending the bracket and prevent the bracket from loosening over time. 2. Ensure the bracket is mounted tight against the bottom of the boom, minimizing the distance between the boom structure and the angled flange.
Page 16
5. Mount the NORAC UC5 ultrasonic sensor into the sensor bracket and run the sensor cable either through hole in the back or through the side cut-out and behind the bracket.
Page 17
Main Lift Sensor Installation 1. The main lift mounting bracket (B21) is the bracket with the longer mounting flange. 2. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom.
Roll Sensor Installation Bracket Assembly 1. Securely mount the roll sensors to the included roll sensor brackets using the #6 machine screws. Tighten screws to 10 in-lbs (1.1 Nm). 2. The orientation of the mounted roll sensor to the roll sensor bracket will depend on the bracket mounting.
Page 19
Roll Sensor Mounting Guidelines: Center Pivot Booms 1. When mounting the roll sensors, mount one to the boom frame and one to the chassis (non-pivoting portion of the sprayer). For optimal performance, minimize the distance between the roll sensors (A) and minimize the height from each roll sensor to the pivot point (B) Figure 14: Roll Sensor Mounting on a Center Pivot Suspended Boom 2.
Page 20
Roll Sensor Mounting on a John Deere Sprayer Chassis Roll Sensor Boom Roll Sensor Figure 16: Roll Sensor Mounting (Viewed from the rear of sprayer)
Page 21
Link Arm Pin Replacement The John Deere link arm located between the black tee frame and the boom must have the top pin replaced. Remove the Top pin from the arm and insert the supplied pin (P04). Replacing this pin removes some free movement on the boom and will improve performance. Figure 17 shows a link arm, but this is often an aluminum color.
Module Installation An optional module mounting bracket kit is available for purchase from NORAC. mounting brackets are compatible with control modules and input modules. One kit is needed per module. Item Part Number Name Quantity 43708 UC5 MOUNTING BRACKET KIT (CONTROL AND INPUT MODULES) Control Module 1.
Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up. Output Number Normal Function Left Up Left Down...
Page 24
Figure 21: Valve Module Bracket Installation 5. Connect the valve module CANbus to cable C01 from the control module. Route cable C02 from the other CANbus connector to the input module. 6. With the valve module securely mounted to the valve block, connect the valve cables (C10), to the valve coils as illustrated in Figure 21.
Page 25
Input Module 1. Install the input module (E03) on the boom near the John Deere valve block. Secure it to the boom using cable ties or optional brackets. 2. Connect the CANbus cable (C02) from the valve module to the input module. 3.
Page 26
6. Route the long cable (with Deutsch connectors) on C21 under the sprayer. Connect the tee connectors into the jam valve connector, located at the JD shuttle valve, under the sprayer (Figure 24). Insert tee connector here Figure 24: Load Sense Jam Valve Connector There is one set of different connectors included with the tilt interface cable.
Follow existing cables and hoses to be sure the cable will not be pinched or stretched. Figure 25: UC5 Module Locations and Cable Connections 5. At the sensor brackets, attach a 2-way coupler with terminator (E20) to the sprayer boom.
Component failure due to oil contamination is not covered under the NORAC UC5 system warranty. It is recommended that a qualified technician perform the hydraulic installation.
Page 29
10.2 Valve Block Mounting 1. A good mounting location for the valve block on the John Deere is illustrated in Figure 27. 2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes are 3/8”...
Page 30
From this point on in the installation the booms will be inoperative until the hydraulics are fully installed. 1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The plumbing for the hydraulic circuit is shown schematically in Figure 3.
3. Turn on the power for the display terminal using the switch on the side. 4. The procedure for the installation of the UC5 Spray Height Control system is now complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5...
Need help?
Do you have a question about the UC5 and is the answer not in the manual?
Questions and answers