Norac UC5 Installation Manual

Norac UC5 Installation Manual

Spray height controller for john deere active roll (30 series, 4720, 4710, 4700)
Hide thumbs Also See for UC5:

Advertisement

Quick Links

Spray Height Controller
John Deere Active Roll
(30 Series, 4720, 4710, 4700)
Installation Manual
JD08A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UC5 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Norac UC5

  • Page 1 Spray Height Controller John Deere Active Roll (30 Series, 4720, 4710, 4700) Installation Manual JD08A...
  • Page 2 Reorder P/N: UC5-BC-JD08A-INST Rev D (JD Active Roll 30 Series, 4720, 4710, 4700) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information contained in this...
  • Page 3: Table Of Contents

    Contents Introduction......................1 General UC5 System Layout .................. 2 Kit Parts........................3 Pre-Install Checklist ....................9 Ultrasonic Sensor Installation................10 Target Installation and Alignment............... 15 Module Installation....................18 Connecting the Sensors to the CAN-Bus ............. 24 Hydraulic Installation.................... 25 Software Setup ....................... 36 System Maintenance ....................
  • Page 4: Introduction

    1 Introduction Congratulations on your purchase of the NORAC UC5 Spray Height Controller. This system is manufactured with top quality components and is engineered using the latest technology to provide operating reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
  • Page 5: General Uc5 System Layout

    2 General UC5 System Layout Figure 1 illustrates the general layout of the UC5 system components: Figure 1: General UC5 System Layout...
  • Page 6: Kit Parts

    3 Kit Parts Kit Overview Figure 2: JD08A System Parts...
  • Page 7 Hydraulic Plumbing Figure 3: JD08A Hydraulic Plumbing...
  • Page 8 CABLE UC5 NETWORK 18 AWG 3M 43210-01 CABLE UC5 NETWORK 18 AWG 1M 43210-20 CABLE UC5 NETWORK 18 AWG 20M 43230-04 CABLE UC5 VALVE 2PIN DT TO 2PIN DT 43240-06 CABLE UC5 INTERFACE TILT JD 43240-05 CABLE UC5 INTERFACE MAIN JD 43250-07...
  • Page 9 105480 HYD CYLINDER ROLL BIAS 1.75IN BORE X 7.125IN STROKE REV A 44864-03 HOSE ASSEMBLY 122R2-08 166 IN L 6FORX 6FORX UC5-BC-JD08A-INST MANUAL INSTALLATION UC5 JD ACTIVE ROLL (30 SERIES, 4720, 4710, 4700) 106034 UC5 NETWORK 2 PIN PLUG 106035...
  • Page 10 Hydraulic Fitting Kit Details (P/N: 44865-36) Picture Item Part Number Name Quantity 104691 TEE ADAPTER - 4FORXR 4MORT 104586 TEE ADAPTER - 6FORXR 6MORT 105226 MALE TO FEMALE ADAPTER - 4MOR 6FORX 44917 MALE ADAPTER - 6MB-6MOR MACHINED ORB 104693 MALE ADAPTER - 4MOR 4MB 44928 ORIFICE INSERT .047 IN ONE WAY...
  • Page 11 Active Roll Hydraulic Fittings Kit Details (P/N: 44865-38) Picture Item Part Number Name Quantity 104586 TEE ADAPTER - 6FORXR 6MORT 105338 TEE ADAPTER - 12FORXOR 12MORT 44916 MALE ADAPTER - 6MB-4MOR MACHINED ORB 104694 MALE ADAPTER 4MOR 4FORX90 F07A 44928 ORIFICE INSERT .047 IN ONE WAY F07B 44935...
  • Page 12: Pre-Install Checklist

    4 Pre-Install Checklist The pre-install checklist is necessary to check the existing sprayer functionality before the installation. 1. Unfold the sprayer over a flat, unobstructed area (i.e. no power lines…etc.). 2. Ensure all boom-fold operations are functional (place a check mark in boxes below). 3.
  • Page 13: Ultrasonic Sensor Installation

    5 Ultrasonic Sensor Installation Bracket Assembly Assemble the breakaway sensor bracket as illustrated in Figure 5, following the instructions below. Figure 5: Breakaway Bracket Assembly 1. Compress the spring and insert it together with the collar into the base. 2. Slide the tube through the assembled part. 3.
  • Page 14 Ultrasonic Sensor Serial Number Arrangement When installing the UC5 sensors, start with the smallest serial number on the left-hand side, and proceed to the largest serial number on the right hand side. Each UC5 sensor has a serial number stamped on the sensor housing.
  • Page 15 Ultrasonic Sensor Mounting Guidelines The following guidelines will ensure optimal sensor performance and prevent sensor measurement error. These rules should be followed for both the wing sensors and the main lift (middle) sensor. 1. In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground (A). 2.
  • Page 16 If the sensor is mounted to this portion of the boom, the system will force the boom downwards towards the ground as the boom folds backwards. 3. Mount the NORAC UC5 ultrasonic sensor into the sensor bracket and run the sensor cable through the sensor tube.
  • Page 17 Main Lift Sensor Installation Figure 9: Main Lift Bracket Assembly 1. There are a variety of ways to mount the main lift bracket on most sprayers. The bracket should position the sensor approximately in the center of the sprayer, forward of the boom. An example of this mounting is illustrated in Figure 10.
  • Page 18: Target Installation And Alignment

    6 Target Installation and Alignment If a foam tank is installed on the left side of the sprayer it may be necessary to install the roll sensor and targets on the right side of the sprayer. Otherwise the targets should be installed on the left side of the sprayer.
  • Page 19 2. Remove the rubber bumpers on both ends of the roll frame (Figure 11). 3. Install the frame target (B07) onto the parallel lift frame. The frame target should be mounted to a frame member that does NOT rotate with the boom. 4.
  • Page 20 7. Adjust the targets and sensor bracket using a level or a plumb line. Ensure the sprayer is level and the booms are level when installing the roll targets. The Spring target must be aligned on the centerline of the sensor. The Frame target must be aligned ½" to the left side of the centerline.
  • Page 21: Module Installation

    7 Module Installation Control Module 1. Refer to Figure 1 and Figure 17. 2. Securely mount the control module (E01) inside the sprayer cab, using screws or cable ties. 3. Connect the display terminal to the control module using the existing display cable. This cable must be connected to the end of the control module with only one Deutsch connector.
  • Page 22 Valve Module 1. Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin Deutsch (CAN-bus) connectors towards the P and T ports. Output Number Normal Function Left Up Left Down Right Up Right Down...
  • Page 23 4. Ensure the bracket is pushed over the connectors far enough to allow the clips to engage behind the valve connectors. Figure 20: Valve Module Bracket Installation 5. Connect the valve module CAN-bus to cable C01 from the control module. Route cable C02 from the other CAN-bus connector to the 6 way coupler.
  • Page 24 Input Module 1. Install the input module (E03) on the boom near the sprayer valve block. Secure it to the boom with cable ties. 2. Connect the free end of the CAN-bus cable (C02) from the valve module to the input module.
  • Page 25 Insert tee connector here Figure 23: Load Sense Jam Valve Connector There is one set of different connectors included with the tilt interface cable. Some John Deere sprayers use this connector on the left down function. If your sprayer has this connector, remove the existing connectors using the included pin removal tool.
  • Page 26 44602-01 BOX SWITCH UC4 REMOTE HAND CONTROL VER.1 RMR 43240-26 CABLE UC5 SWITCH BOX 1. Disconnect cable C20 (grey side connector) from the Input Module (E03). Remove the wedge from the face of the 12 pin Deutsch plug. 2. Insert the Roll CW pin from C26 into position 3 of the 12 pin plug on C20. Insert the Roll CCW pin from C26 into position 4 of the 12 pin plug on C20.
  • Page 27: Connecting The Sensors To The Can-Bus

    Follow existing cables and hoses to be sure the cable will not be pinched or stretched. Figure 25: UC5 Module Locations and Cable Connections 5. At the sensor brackets, attach a 3-way coupler (E20) to the sprayer boom. Plug the sensor and the CAN-bus cable into the 3-way coupler.
  • Page 28: Hydraulic Installation

    Component failure due to oil contamination is not covered under the NORAC UC5 system warranty. It is recommended that a qualified technician perform the hydraulic installation.
  • Page 29 6. Install the .042 orifice (F07B) into the “A” port of the expansion block with the notch facing in. Install the 6MB-4MOR (F12) fitting into the “A” port. Tighten to 18 ft-lbs (24 Nm). Figure 27: NORAC Valve Block Details...
  • Page 30 Valve Block Mounting 1. A good mounting location for the valve block on the John Deere is illustrated in Figure 28. 2. Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes are 3/8”...
  • Page 31 Roll Cylinder Installation 1. Remove the link arm (black square tube) connected between the parallel lift frame and roll frame. See Figure 29 for the link arm location. Link Figure 29: John Deere Link Arm Location (looking towards rear of sprayer) 2.
  • Page 32 3. In some cases, the bracket has failed at the weld shown in Figure 31. It is recommended that all sprayers with roll control add weld to the existing bracket to prevent failure. Some sprayers from 2005 and newer already have gussets added at the factory. Figure 31: Roll Cylinder Mount Weld Locations 4.
  • Page 33 2. Attach the 6FORXR-6MORT (F10) fitting to the pressure and tank ports on the NORAC valve block (V01). 3. Connect hose H70 to the tank port on the NORAC valve and H71 to the pressure port. 4. Connect hoses H03 to the tees install at the pressure and tank ports on the NORAC valve block (V01).
  • Page 34 John Deere valve block. Attach the other end of the hoses H02 to the NORAC valve block “A” and “B” ports. The “raise” lines must be connected to the "B" ports of the NORAC valve block. The “lower” lines must be connected to the "A" ports of the NORAC valve block.
  • Page 35 On a 30 series, the load sense line should be teed into the AL port. If unsure where to tee the load sense, teeing directly into the pump will always work. Refer to Figure 35 for an example of teeing into the pump. Figure 34: General JD Shuttle Valve Location NORAC Tee Figure 35: Load Sense Teed in Pump...
  • Page 36 Load Sense Figure 36: Load Sense Line Connection...
  • Page 37 Load Sense Figure 37: Looking Towards the Rear of the Sprayer on a John Deere 4700 Load Sense Figure 38: Load Sense Plumbing on Some John Deere 4710’s (looking towards the rear)
  • Page 38 Load Sense Rear of Sprayer Front View of Block Figure 39: Load Sense Plumbing on Some John Deere 4710’s...
  • Page 39: Software Setup

    3. Turn on the power for the display terminal using the switch on the side. 4. The procedure for the installation of the UC5 Spray Height Control system is now complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5 Spray Height...
  • Page 40: System Maintenance

    11 System Maintenance For good performance in corners, when driving over terraces or through ditches at an angle, or in hard steer situations it is important to do the following: 1. The Teflon sliding pads on the boom must not grab in dynamic situations (corners, terraces etc).
  • Page 41 Figure 41: Upper Front Sliding Pad Figure 42: Lower Front and Rear Sliding Pads...
  • Page 42: Cable Drawings

    12 Cable Drawings 12.1 ITEM C01: 43220-10 - CABLE UC5 NETWORK 14 AWG - 10M 12.2 ITEM C02: 43220-01 - CABLE UC5 NETWORK 14 AWG - 1M...
  • Page 43 12.3 ITEM C03: 43210-03 - CABLE UC5 NETWORK 18 AWG - 3M 12.4 ITEM C04: 43210-01 - CABLE UC5 NETWORK 18 AWG - 1M...
  • Page 44 12.5 ITEM C05: 43210-20 - CABLE UC5 NETWORK 18 AWG - 20M 12.6 ITEM C10: 43230-04 – CABLE UC5 VALVE DT TO DT...
  • Page 45 12.7 ITEM C20: 43240-06 – CABLE UC5 INTERFACE TILT JD...
  • Page 46 12.8 ITEM C21: 43240-05 – CABLE UC5 INTERFACE MAIN JD...
  • Page 47 12.9 ITEM C25: 44602-01 – SWITCH REMOTE HAND CONTROL...
  • Page 48 12.10 ITEM C26: 43240-26 – CABLE UC5 SWITCH BOX...
  • Page 49 12.11 ITEM C30: 43250-07 – CABLE UC5 BATTERY JD...
  • Page 50 Canada NORAC Systems International Inc. Phone: (+1) 306 664 6711 Toll Free: 1 800 667 3921 Shipping Address: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States NORAC, Inc. Phone: (+1) 763 786 3080 Toll Free: 1 866 306 6722...

Table of Contents