Page 1
John Deere GS2 2600, 1800 and GS3 2630 JD 4630 Display Kit Installation Manual GS2-SP02...
Page 2
4630 Display Kit) NOTICE: NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
UC5 Spray Height Control Installation Manual. This manual provides instructions to interface the UC5 Control Module to the John Deere GS2 2600, 1800 and GS3 2630 Display. For installation of the rest of the UC5 Spray Height Control System please refer to the sprayer specific manual provided with the kit.
2 Technical Specifications CAN ICES-3(A)/NMB-3(A) This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
3 Installation CANbus Interface Installation 1. Securely mount the control module (E01) inside the sprayer cab. 2. Tee the CANbus interface cable (C40) in to the John Deere CANbus. The John Deere CANbus connection can be found in the right hand armrest. The connector is a 4 pin Deutsch plug labeled “CAN 2”.
Switch Box Installation 1. This step of the installation assumes that the input module and all required cables are installed. 2. Disconnect cable C20 (Thru 2 connector) from the Input Module (E03). Remove the wedge from the face of the 12 pin Deutsch plug. The wedge is removed by inserting a small flat implement underneath the wedge and lifting it up.
Need help?
Do you have a question about the UC5 and is the answer not in the manual?
Questions and answers