Maintenance Checklist; Preventative Maintenance Key; Preventative Maintenance Report - Upright SL20 Operator's Manual

Hide thumbs Also See for SL20:
Table of Contents

Advertisement

P
REVENTATIVE
P
M
REVENTATIVE
AINTENANCE
Interval
Daily=each shift or every day
50h/30d=every 50 hours or 30 days
250h/6m=every 250 hours or 6 months
1000h/2y=every 1000 hours or 2 years
Y=Yes/Acceptable
N=No/Not Acceptable
R=Repaired/Acceptable
COMPONENT
INSPECTION OR SERVICES
Battery
Check electrolyte level
Check specific gravity
Clean exterior
Check battery cable condition
Clean terminals
Hydraulic
Check oil level
Oil
Change filter
Drain and replace oil
Check for leaks
Hydraulic
System
Check hose connections
Check hoses for exterior wear
Emergency
Operate the emergency lowering valve
Hydraulic
and check for serviceability
System
Check switch operation
Controller
Control
Check the exterior of the cable for
pinching, binding or wear
Cable
Check fasteners for proper torque
Platform
Deck and
Check welds for cracks
Rails
Check condition of deck
Check for damage
Tires
Check lug nuts (torque to 108 Nm [80 ft.
lbs])
Wipe clean
Hydraulic
Pump
Check for leaks at mating surfaces
Check for hose fitting leaks
Check mounting bolts for proper torque
Drive
Check for operation and leaks
Motors
Steering
Check hardware & fittings for proper
torque
System
Grease pivot pins
Oil king pins
Check steering cylinder for leaks
SL20
M
C
AINTENANCE
K
EY
INTERVAL
Daily
6m
6m
Daily
6m
Daily
6m
2y
Daily
30d
30d
Daily
Daily
Daily
6m
Daily
Daily
Daily
6m
30d
30d
Daily
6m
Daily
6m
30d
30d
30d
HECKLIST
P
REVENTATIVE
Date: _______________________________________
Owner: _____________________________________
Model No: ___________________________________
Serial No: ___________________________________
Serviced By: _________________________________
Service Interval: ______________________________
COMPONENT
INSPECTION OR SERVICES
Y
N
R
Inspect for structural cracks
Elevating
Assembly
Check pivot points for wear
Check mounting pin pivot bolts for proper
torque
Check elevating arms for bending
Check hoses for pinch or rubbing points
Chassis
Check component mounting for proper
torque
Check welds for cracks
Check the cylinder rod for wear
Lift Cylinder
Check mounting pin pivot bolts for proper
torque
Check seals for leaks
Inspect pivot points for wear
Check fittings for proper torque
Check for and repair collision damage
Entire Unit
Check fasteners for proper torque
Check for corrosion-remove and repaint
Lubricate
Labels
Check for peeling, missing, or unreadable
labels & replace
M
R
AINTENANCE
EPORT
INTERVAL
Daily
6m
6m
6m
Daily
6m
Daily
30d
6m
30d
6m
6m
Daily
6m
6m
30d
Daily
Y
N
R
Page 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

9300

Table of Contents