SUN2000-(55KTL, 60KTL) Series
User Manual
Figure 5-8 Routing cables
Step 4 Land the AC output power cable in the terminal block, and tighten the nuts with a torque
wrench to achieve a proper torque value.
Figure 5-9 Connecting an AC output power cable (three-core cable)
Issue 02 (2017-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
38