SUN2000-(55KTL, 60KTL) Series
User Manual
Figure 5-21 Routing cables
Step 4 Install the terminal base on the terminal block, and connect the shield layer to the ground
point.
When connecting the shielded cable, crimp the OT terminal if required.
Issue 02 (2017-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
49