GE T60 Instruction Manual page 287

Transformer protection system
Hide thumbs Also See for T60:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS
The 48 amber LEDs on relay panels 2 and 3 can be customized to illuminate when a selected FlexLogic operand is in the
logic 1 state. The trip and alarm LEDs on panel 1 can also be customized in a similar manner. To ensure correct
functionality of all LEDs, an LED test feature is also provided.
5.3.11.2 LED test
SETTINGS  PRODUCT SETUP  USER-PROGRAMMABLE LEDS  LED TEST
 LED TEST
When enabled, the LED test can be initiated from any digital input or user-programmable condition, such as a user-
programmable pushbutton. The control operand is configured under the
LEDs, including the LEDs of the optional user-programmable pushbuttons.
The test consists of the following three stages:
1.
All 62 LEDs on the relay are illuminated. This is a quick test to verify if any of the LEDs is "burned." This stage lasts as
long as the control input is on, up to a maximum of 1 minute. After 1 minute, the test ends.
2.
All the LEDs are turned off, and then one LED at a time turns on for 1 second, then back off. The test routine starts at
the top left panel, moving from the top to bottom of each LED column. This test checks for hardware failures that lead
to more than one LED being turned on from a single logic point. This stage can be interrupted at any time.
3.
All the LEDs are turned on. One LED at a time turns off for 1 second, then back on. The test routine starts at the top left
panel moving from top to bottom of each column of the LEDs. This test checks for hardware failures that lead to more
than one LED being turned off from a single logic point. This stage can be interrupted at any time.
When testing is in progress, the LEDs are controlled by the test sequence, rather than the protection, control, and
monitoring features. However, the LED control mechanism accepts all the changes to LED states generated by the relay
and stores the actual LED states (on or off) in memory. When the test completes, the LEDs reflect the actual state resulting
from relay response during testing. The reset pushbutton does not clear any targets when the LED Test is in progress.
A dedicated FlexLogic operand,
the LED TEST INITIATED event is stored in the event recorder.
The entire test procedure is user-controlled. In particular, stage 1 can last as long as necessary, and stages 2 and 3 can be
interrupted. The test responds to the position and rising edges of the control input defined by the
setting. The control pulses must last at least 250 ms to take effect. The following diagram explains how the test is
executed.
T60 TRANSFORMER PROTECTION SYSTEM – INSTRUCTION MANUAL
LED TEST FUNCTION:
Disabled
LED TEST CONTROL:
Off
PROGRESS, is set for the duration of the test. When the test sequence is initiated,
LED TEST IN
Range: Disabled, Enabled
Range: FlexLogic operand
setting. The test covers all
LED TEST CONTROL
LED TEST CONTROL
PRODUCT SETUP
5
5-105