F. Vent Diagrams

General Rules:
• Elbows may be placed back to back anywhere in the
system.
Any 90º elbow may be replaced with two back to back
45º elbows.
• When penetrating a combustible wall, a wall shield
firestop must be installed.
• When penetrating a combustible ceiling, a ceiling firestop
must be installed.
• Horizontal runs of vent do not require vertical rise;
horizontal runs may be level.
• Horizontal termination cap should have a 1/4 in. (6
mm) downward slant to allow any moisture in cap to be
released. See Figure 4.8.
1/4 in. max.
(6 mm)
Figure 4.8 Vent Cap