Remote Wiring Harness And Control Cable Installation - Mercury 15 EFI SeaPro Installation, Operation & Maintenance Manual

Table of Contents

Advertisement

Assemble the steering link rod to the engine with bolt, locknut, spacer, and flat
washers. Tighten the locknut to the specified torque.
b
c
b
a
a -
Bolt
b -
Flat washer
c -
Spacer
d -
Nylon insert locknut
e -
Steering bracket
f -
Nylon insert locknut ‑ tighten until it seats, then back off 1/4 turn
Description
Nylon insert locknut "d"
Nylon insert locknut "f"

Remote Wiring Harness and Control Cable Installation

DRIVESHAFT HOUSING COVER REMOVAL AND INSTALLATION
Removal
1. Remove the top cowl.
2. Remove the cowl seal.
ENGINE INSTALLATION
d
e
114
Nm
27
Tighten until it seats, then back off 1/4
b
f
63289
lb‑in.
lb‑ft
20
turn
eng

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

20 efi fourstroke15 efi fourstroke

Table of Contents